Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
08/07/2025
Applicant:
Annette Suarez
Description:
NEW ONE-STORY BLDG 4 BEDROOMS UNIT & 3 BAY CARPORT

Permit Reviews

Permit Number - TC-COM-0825-01480
Permit Status: Inspections
Permit Description: NEW ONE-STORY BLDG 4 BEDROOMS UNIT & 3 BAY CARPORT
Start Date Submittal Complete Date Status  
12/03/2025 COMMERCIAL REVIEW - FULL v.2 12/22/2025 APPROVED Review Details
09/18/2025 COMMERCIAL REVIEW - FULL v.2 10/06/2025 APPROVED Review Details
12/22/2025 ADMINISTRATIVE v.2 12/22/2025 APPROVED Review Details
11/21/2025 COMMERCIAL REVIEW - FULL v.1 11/21/2025 REQUIRES RESUBMIT Review Details
10/09/2025 ADMINISTRATIVE v.1 10/09/2025 REQUIRES RESUBMIT Review Details
08/07/2025 COMMERCIAL REVIEW - FULL v.1 08/29/2025 REQUIRES RESUBMIT Review Details
10/06/2025 RESTAMP - COMMERCIAL v.1 10/09/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0825-01480
Permit Status: Inspections
Permit Description: NEW ONE-STORY BLDG 4 BEDROOMS UNIT & 3 BAY CARPORT
Total Outstanding Activity Conditions - 7
Date Name
08/28/2025 AIR BALANCING REPORT IS REQUIRED.
08/28/2025 SPECIAL INSPECTION OF POST-INSTALLED ANCHORS IS REQUIRED.
08/28/2025 SPECIAL INSPECTION OF SOILS IS REQUIRED.
08/28/2025 SPECIAL INSPECTION OF STEEL CONSTRUCTION IS REQUIRED.
08/28/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
08/28/2025 WATER STERILIZATION REPORT IS REQUIRED.
09/19/2025 Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit.

Conditions

Permit Number - TC-COM-0825-01480
Permit Status: Inspections
Permit Description: NEW ONE-STORY BLDG 4 BEDROOMS UNIT & 3 BAY CARPORT
Date Description Comments
10/08/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
09/19/2025 An intermediate Elevation Certificate is required PRIOR TO GRADING and/or PRE-SLAB INSPECTION.
08/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/21/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/07/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
08/28/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0825-01480
Permite Description: NEW ONE-STORY BLDG 4 BEDROOMS UNIT & 3 BAY CARPORT
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
06/18/2026 COT - LCBU - Roof Nailing N/A Partial Pass Main house only.
10/07/2026 COT - BULD - SWG Clearance N/A Not Ready
10/14/2026 COT - LCPL - Sewer N/A Partial Pass Partial pass from new builds to unit 2943 b, ok to backfill trench, will check point of connection at later date

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0825-01480
Permit Description: NEW ONE-STORY BLDG 4 BEDROOMS UNIT & 3 BAY CARPORT
Total Completed Inspections - 14
Date Description Inspector Results Comments
03/17/2026 COT - LCPL - Rough Soil Passed
05/18/2026 LCBU - Preslab and Floodplain Inspection Passed
05/18/2026 COT - LCBU - Excavation/Rebar/Zoning Passed
07/24/2026 COT - LCPL - Yard Water Line Passed Passed
07/24/2026 COT - HCBU - Exterior Clips/Sheathing Passed Passed
07/24/2026 COT - LCBU - Roof Nailing Passed Passed
09/11/2026 BULD - Electrical Clearance Passed ECO

TEP
09/11/2026 COT - LCBU - Framing Passed
09/11/2026 COT - LCEL - Electrical Intermediate Passed
09/11/2026 COT - LCPL - Gas Pressure Test Passed
09/11/2026 COT - LCME - Mechanical Intermediate Passed
09/11/2026 COT - LCEL - Grounding/Bonding Passed
09/11/2026 COT - LCPL - Plumbing Intermediate Passed
10/15/2026 COT - LCPL - Sewer Passed Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
INSPECTION CERT-2025-11-26_V2.PDF DOCUMENTS VIEW
1_STRUCTURAL CALCS APT_V2.PDF DOCUMENTS VIEW
CONS-2_PLAN SET APT_V2.PDF DOCUMENTS VIEW