Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
08/28/2024
Applicant:
burak bekat
Description:
DEPENDABLE HEALTH SUITE 4000 - OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. THE ENTIRE SF OF EXISTING SUITE 4000 IS 9860 SF. THIS PROJECT WILL RETAIN SUITE 4000 ADDRESS, AND TOTALS 4910 SF. THE EXISTING SPACE IS TO BE SPLIT INTO 3 SUITES, SUITE 4000, 4010, AND 4020. SUITES 4010 AND 4020 TO BE SUBMITTED UNDER SEPARATE PERMIT. THIS RENOVATION INCLUDES NEW PARTITION WALL LAYOUT THROUGHOUT, REWORKING OF LIGHTING, AND MECHANICAL TO WORK NEW FLOOR PLAN LAYOUT.

Permit Reviews

Permit Number - TC-COM-0824-01684
Permit Status: Complete
Permit Description: DEPENDABLE HEALTH SUITE 4000 - OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. THE ENTIRE SF OF EXISTING SUITE 4000 IS 9860 SF. THIS PROJECT WILL RETAIN SUITE 4000 ADDRESS, AND TOTALS 4910 SF. THE EXISTING SPACE IS TO BE SPLIT INTO 3 SUITES, SUITE 4000, 4010, AND 4020. SUITES 4010 AND 4020 TO BE SUBMITTED UNDER SEPARATE PERMIT. THIS RENOVATION INCLUDES NEW PARTITION WALL LAYOUT THROUGHOUT, REWORKING OF LIGHTING, AND MECHANICAL TO WORK NEW FLOOR PLAN LAYOUT.
Start Date Submittal Complete Date Status  
09/10/2024 COMMERCIAL REVIEW - FULL v.2 10/07/2024 APPROVED Review Details
09/03/2024 COMMERCIAL REVIEW - FULL v.1 09/03/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0824-01684
Permit Status: Complete
Permit Description: DEPENDABLE HEALTH SUITE 4000 - OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. THE ENTIRE SF OF EXISTING SUITE 4000 IS 9860 SF. THIS PROJECT WILL RETAIN SUITE 4000 ADDRESS, AND TOTALS 4910 SF. THE EXISTING SPACE IS TO BE SPLIT INTO 3 SUITES, SUITE 4000, 4010, AND 4020. SUITES 4010 AND 4020 TO BE SUBMITTED UNDER SEPARATE PERMIT. THIS RENOVATION INCLUDES NEW PARTITION WALL LAYOUT THROUGHOUT, REWORKING OF LIGHTING, AND MECHANICAL TO WORK NEW FLOOR PLAN LAYOUT.
Date Description Comments
10/07/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/07/2024 This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0824-01684
Permite Description: DEPENDABLE HEALTH SUITE 4000 - OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. THE ENTIRE SF OF EXISTING SUITE 4000 IS 9860 SF. THIS PROJECT WILL RETAIN SUITE 4000 ADDRESS, AND TOTALS 4910 SF. THE EXISTING SPACE IS TO BE SPLIT INTO 3 SUITES, SUITE 4000, 4010, AND 4020. SUITES 4010 AND 4020 TO BE SUBMITTED UNDER SEPARATE PERMIT. THIS RENOVATION INCLUDES NEW PARTITION WALL LAYOUT THROUGHOUT, REWORKING OF LIGHTING, AND MECHANICAL TO WORK NEW FLOOR PLAN LAYOUT.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
11/05/2024 COT - FCON - Alarm - Final N/A Partial Pass Alarm contractor still needs to pay early inspection fee.
11/06/2024 COT - BULD - SWG Clearance N/A Not Applicable
11/06/2024 ENGR Engineering Final N/A Not Applicable This was all attributed to 4th and 5th floors. No exterior work was done. Dumpsters and Port a Jon have been removed. No construction materials are on site.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0824-01684
Permit Description: DEPENDABLE HEALTH SUITE 4000 - OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. THE ENTIRE SF OF EXISTING SUITE 4000 IS 9860 SF. THIS PROJECT WILL RETAIN SUITE 4000 ADDRESS, AND TOTALS 4910 SF. THE EXISTING SPACE IS TO BE SPLIT INTO 3 SUITES, SUITE 4000, 4010, AND 4020. SUITES 4010 AND 4020 TO BE SUBMITTED UNDER SEPARATE PERMIT. THIS RENOVATION INCLUDES NEW PARTITION WALL LAYOUT THROUGHOUT, REWORKING OF LIGHTING, AND MECHANICAL TO WORK NEW FLOOR PLAN LAYOUT.
Total Completed Inspections - 12
Date Description Inspector Results Comments
11/06/2024 COT - FCON - Alarm - Final Passed
11/06/2024 BULD - Electrical Clearance Passed No electric clearance required.
11/06/2024 COT - LCEL - Electrical Intermediate Passed
11/06/2024 COT - LCPL - Plumbing Final Passed
11/06/2024 TRSP - ROW - Final/Close-Out Passed
11/06/2024 COT - HCME - Mechanical Intermediate Passed
11/06/2024 COT - LCEL - Electrical Above Ceiling Passed
11/06/2024 COT - LCME - Mechanical Final Passed
11/06/2024 COT - LCEL - Electrical Final Passed
11/06/2024 COT - LCBU - Building Final Passed
11/12/2024 COT - FCON - Fire - Final Passed
11/12/2024 COT - FCON - Sprinkler - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW