Permit: TC-COM-0824-01684
Permit Details
Apply Date:
08/28/2024
Applicant:
burak bekat
Description:
DEPENDABLE HEALTH SUITE 4000 - OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. THE ENTIRE SF OF EXISTING SUITE 4000 IS 9860 SF. THIS PROJECT WILL RETAIN SUITE 4000 ADDRESS, AND TOTALS 4910 SF. THE EXISTING SPACE IS TO BE SPLIT INTO 3 SUITES, SUITE 4000, 4010, AND 4020. SUITES 4010 AND 4020 TO BE SUBMITTED UNDER SEPARATE PERMIT. THIS RENOVATION INCLUDES NEW PARTITION WALL LAYOUT THROUGHOUT, REWORKING OF LIGHTING, AND MECHANICAL TO WORK NEW FLOOR PLAN LAYOUT.
Permit Reviews
Permit Number - TC-COM-0824-01684
Permit Status: Complete
Permit Description: DEPENDABLE HEALTH SUITE 4000 - OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. THE ENTIRE SF OF EXISTING SUITE 4000 IS 9860 SF. THIS PROJECT WILL RETAIN SUITE 4000 ADDRESS, AND TOTALS 4910 SF. THE EXISTING SPACE IS TO BE SPLIT INTO 3 SUITES, SUITE 4000, 4010, AND 4020. SUITES 4010 AND 4020 TO BE SUBMITTED UNDER SEPARATE PERMIT. THIS RENOVATION INCLUDES NEW PARTITION WALL LAYOUT THROUGHOUT, REWORKING OF LIGHTING, AND MECHANICAL TO WORK NEW FLOOR PLAN LAYOUT.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/10/2024 | COMMERCIAL REVIEW - FULL v.2 | 10/07/2024 | APPROVED |
09/03/2024 | COMMERCIAL REVIEW - FULL v.1 | 09/03/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0824-01684
Permit Status: Complete
Permit Description: DEPENDABLE HEALTH SUITE 4000 - OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. THE ENTIRE SF OF EXISTING SUITE 4000 IS 9860 SF. THIS PROJECT WILL RETAIN SUITE 4000 ADDRESS, AND TOTALS 4910 SF. THE EXISTING SPACE IS TO BE SPLIT INTO 3 SUITES, SUITE 4000, 4010, AND 4020. SUITES 4010 AND 4020 TO BE SUBMITTED UNDER SEPARATE PERMIT. THIS RENOVATION INCLUDES NEW PARTITION WALL LAYOUT THROUGHOUT, REWORKING OF LIGHTING, AND MECHANICAL TO WORK NEW FLOOR PLAN LAYOUT.
Date | Description | Comments |
---|---|---|
10/07/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
10/07/2024 | This project requires the completion of a Fire Construction Permit PRIOR TO FINALING this permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0824-01684
Permite Description: DEPENDABLE HEALTH SUITE 4000 - OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. THE ENTIRE SF OF EXISTING SUITE 4000 IS 9860 SF. THIS PROJECT WILL RETAIN SUITE 4000 ADDRESS, AND TOTALS 4910 SF. THE EXISTING SPACE IS TO BE SPLIT INTO 3 SUITES, SUITE 4000, 4010, AND 4020. SUITES 4010 AND 4020 TO BE SUBMITTED UNDER SEPARATE PERMIT. THIS RENOVATION INCLUDES NEW PARTITION WALL LAYOUT THROUGHOUT, REWORKING OF LIGHTING, AND MECHANICAL TO WORK NEW FLOOR PLAN LAYOUT.
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/05/2024 | COT - FCON - Alarm - Final | N/A | Partial Pass | Alarm contractor still needs to pay early inspection fee. |
11/06/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
11/06/2024 | ENGR Engineering Final | N/A | Not Applicable | This was all attributed to 4th and 5th floors. No exterior work was done. Dumpsters and Port a Jon have been removed. No construction materials are on site. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0824-01684
Permit Description: DEPENDABLE HEALTH SUITE 4000 - OFFICE TENANT IMPROVEMENT. NO CHANGE OF USE OR ADDITIONAL SF TO EXISTING SUITE. THE ENTIRE SF OF EXISTING SUITE 4000 IS 9860 SF. THIS PROJECT WILL RETAIN SUITE 4000 ADDRESS, AND TOTALS 4910 SF. THE EXISTING SPACE IS TO BE SPLIT INTO 3 SUITES, SUITE 4000, 4010, AND 4020. SUITES 4010 AND 4020 TO BE SUBMITTED UNDER SEPARATE PERMIT. THIS RENOVATION INCLUDES NEW PARTITION WALL LAYOUT THROUGHOUT, REWORKING OF LIGHTING, AND MECHANICAL TO WORK NEW FLOOR PLAN LAYOUT.
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/06/2024 | COT - FCON - Alarm - Final | Passed | ||
11/06/2024 | BULD - Electrical Clearance | Passed | No electric clearance required. | |
11/06/2024 | COT - LCEL - Electrical Intermediate | Passed | ||
11/06/2024 | COT - LCPL - Plumbing Final | Passed | ||
11/06/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
11/06/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
11/06/2024 | COT - LCEL - Electrical Above Ceiling | Passed | ||
11/06/2024 | COT - LCME - Mechanical Final | Passed | ||
11/06/2024 | COT - LCEL - Electrical Final | Passed | ||
11/06/2024 | COT - LCBU - Building Final | Passed | ||
11/12/2024 | COT - FCON - Fire - Final | Passed | ||
11/12/2024 | COT - FCON - Sprinkler - Final | Passed |