Permit: TC-COM-0824-01653
Permit Details
Apply Date:
08/23/2024
Applicant:
lennard legaspi
Description:
SHADE STRUCTURE 1: CONSISTING OF: (2) SHADE SAILS & (6) COLUMNS, PROVIDING APPROX. 1,753 TOTAL SQUARE FEET OF SHADE. SHADE STRUCTURES 2: CONSISTING OF: (4) 20X20 HYPAR CANTILEVERED GORILLABRELLAS PROVIDING APPROX. 1,380 TOTAL SQUARE FEET OF SHADE.
Permit Reviews
Permit Number - TC-COM-0824-01653
Permit Status: Complete
Permit Description: SHADE STRUCTURE 1:
CONSISTING OF: (2) SHADE SAILS & (6) COLUMNS, PROVIDING APPROX. 1,753 TOTAL SQUARE FEET OF SHADE.
SHADE STRUCTURES 2:
CONSISTING OF: (4) 20X20 HYPAR CANTILEVERED GORILLABRELLAS PROVIDING APPROX. 1,380 TOTAL SQUARE FEET OF SHADE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/26/2024 | COMMERCIAL REVIEW - LIMITED v.1 | 09/10/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0824-01653
Permite Description: SHADE STRUCTURE 1:
CONSISTING OF: (2) SHADE SAILS & (6) COLUMNS, PROVIDING APPROX. 1,753 TOTAL SQUARE FEET OF SHADE.
SHADE STRUCTURES 2:
CONSISTING OF: (4) 20X20 HYPAR CANTILEVERED GORILLABRELLAS PROVIDING APPROX. 1,380 TOTAL SQUARE FEET OF SHADE.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2024 | COT - LCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 11/5/24: canceled per Lennard 11/6/24: column footings at East Canopy per plans ok to proceed with concrete placement. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0824-01653
Permit Description: SHADE STRUCTURE 1:
CONSISTING OF: (2) SHADE SAILS & (6) COLUMNS, PROVIDING APPROX. 1,753 TOTAL SQUARE FEET OF SHADE.
SHADE STRUCTURES 2:
CONSISTING OF: (4) 20X20 HYPAR CANTILEVERED GORILLABRELLAS PROVIDING APPROX. 1,380 TOTAL SQUARE FEET OF SHADE.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 11/5/24: canceled per Lennard 11/6/24: column footings at East Canopy per plans ok to proceed with concrete placement. Footings for shade structures at splash pad passed (907,908,909,910) |
|
| 03/25/2025 | COT - LCBU - Building Final | Passed | 3-25-25, building final approved. | |
| 03/25/2025 | ENGR Engineering Final | Passed | ||
| 03/25/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 03/25/2025 | COT - LCBU - Framing | Passed | 3-25-25, approved. |