Permit: TC-COM-0824-01572
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
3950 E FAIRMOUNT ST
Address NEW:
3950 E FAIRMOUNT ST
Apply Date:
08/13/2024
Applicant:
Boris Gefter
Description:
OF UPGRADING MAIN ELECTRICAL SERVICE, WE ARE GOING TO INSTALL T. E.P. APPROVED 2 EA. TWO METER PACKS MADE BY CUTLER HUMMER, EATON, ONE WILL BE 125 AMP. 250 V. RATED BUSSING PER EACH UNIT, PART # 1 MP 2122 R, SEVICE WILL BE ABLE TO HANDLE UP TO 250 AMP. TOTAL LOAD, SECOND TWO METER PACK, WILL BE PROVIDED BY THE OWNER, IT IS 100 AMP. 250 V. PER EACH UNIT, CUTLER HUMMER ALSO, PROVIDE PROPER GROUNDING
Permit Reviews
Permit Number - TC-COM-0824-01572
Permit Status: Complete
Permit Description: OF UPGRADING MAIN ELECTRICAL SERVICE, WE ARE GOING TO INSTALL T. E.P. APPROVED 2 EA. TWO METER PACKS MADE BY CUTLER HUMMER, EATON, ONE WILL BE 125 AMP. 250 V. RATED BUSSING PER EACH UNIT, PART # 1 MP 2122 R, SEVICE WILL BE ABLE TO HANDLE UP TO 250 AMP. TOTAL LOAD, SECOND TWO METER PACK, WILL BE PROVIDED BY THE OWNER, IT IS 100 AMP. 250 V. PER EACH UNIT, CUTLER HUMMER ALSO, PROVIDE PROPER GROUNDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/14/2024 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 08/14/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0824-01572
Permite Description: OF UPGRADING MAIN ELECTRICAL SERVICE, WE ARE GOING TO INSTALL T. E.P. APPROVED 2 EA. TWO METER PACKS MADE BY CUTLER HUMMER, EATON, ONE WILL BE 125 AMP. 250 V. RATED BUSSING PER EACH UNIT, PART # 1 MP 2122 R, SEVICE WILL BE ABLE TO HANDLE UP TO 250 AMP. TOTAL LOAD, SECOND TWO METER PACK, WILL BE PROVIDED BY THE OWNER, IT IS 100 AMP. 250 V. PER EACH UNIT, CUTLER HUMMER ALSO, PROVIDE PROPER GROUNDING
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2024 | COT - LCEL - Electrical Intermediate | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0824-01572
Permit Description: OF UPGRADING MAIN ELECTRICAL SERVICE, WE ARE GOING TO INSTALL T. E.P. APPROVED 2 EA. TWO METER PACKS MADE BY CUTLER HUMMER, EATON, ONE WILL BE 125 AMP. 250 V. RATED BUSSING PER EACH UNIT, PART # 1 MP 2122 R, SEVICE WILL BE ABLE TO HANDLE UP TO 250 AMP. TOTAL LOAD, SECOND TWO METER PACK, WILL BE PROVIDED BY THE OWNER, IT IS 100 AMP. 250 V. PER EACH UNIT, CUTLER HUMMER ALSO, PROVIDE PROPER GROUNDING
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2024 | BULD - Electrical Clearance | Passed | Approved multi-meter service panel upgrade - INCR Clearance to TEP is required for 3 meters (3950 E Fairmount , 3952 E Fairmount , 3954 E Fairmount) | |
| 08/21/2024 | COT - LCEL - Grounding/Bonding | Passed | ||
| 09/09/2024 | COT - LCEL - Electrical Final | Passed | Approval for 3950,3952 and 3954 |