Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Address NEW:
7355 E TANQUE VERDE RD
Apply Date:
08/06/2024
Applicant:
Annette Suarez
Description:
Addition at the existing patio in an existing building for a liquid nitrogen generator. this is a 2% expansion. REV1_SHEETS A1 AND A2 - EXTERIOR WALL ASSEMBLY REVISED TO EIFS 3" IN LIEU OF STUCCO

Permit Reviews

Permit Number - TC-COM-0824-01519
Permit Status: Inspections complete
Permit Description: Addition at the existing patio in an existing building for a liquid nitrogen generator. this is a 2% expansion. REV1_SHEETS A1 AND A2 - EXTERIOR WALL ASSEMBLY REVISED TO EIFS 3" IN LIEU OF STUCCO
Start Date Submittal Complete Date Status  
10/08/2024 COMMERCIAL REVIEW - LIMITED v.3 10/15/2024 APPROVED Review Details
08/06/2024 COMMERCIAL REVIEW - LIMITED v.1 08/22/2024 REQUIRES RESUBMIT Review Details
08/30/2024 COMMERCIAL REVIEW - LIMITED v.2 08/30/2024 REQUIRES RESUBMIT Review Details
10/15/2024 RESTAMP - COMMERCIAL v.1 11/14/2024 APPROVED Review Details
10/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/31/2025 APPROVED Review Details
12/01/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 12/03/2025 APPROVED Review Details
09/30/2025 RESTAMP - COMMERCIAL v.1 10/13/2025 APPROVED Review Details
11/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/25/2025 REQUIRES RESUBMIT Review Details
09/25/2025 COMMERCIAL REVIEW - FULL REVISION v.2 09/30/2025 APPROVED Review Details
09/24/2025 COMMERCIAL REVIEW - FULL REVISION v.1 09/24/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0824-01519
Permit Status: Inspections complete
Permit Description: Addition at the existing patio in an existing building for a liquid nitrogen generator. this is a 2% expansion. REV1_SHEETS A1 AND A2 - EXTERIOR WALL ASSEMBLY REVISED TO EIFS 3" IN LIEU OF STUCCO
Date Description Comments
08/06/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
08/22/2024 SPECIAL INSPECTION FOR MEDICAL GASES IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0824-01519
Permite Description: Addition at the existing patio in an existing building for a liquid nitrogen generator. this is a 2% expansion. REV1_SHEETS A1 AND A2 - EXTERIOR WALL ASSEMBLY REVISED TO EIFS 3" IN LIEU OF STUCCO
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
04/15/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Not Applicable
04/30/2025 COT - HCBU - Building Above Ceiling N/A Not Applicable
04/30/2025 COT - HCME - Mechanical Above Ceiling N/A Not Applicable
04/30/2025 BULD - Electrical Clearance N/A Not Applicable
04/30/2025 COT - BULD - SWG Clearance N/A Not Applicable
04/14/2025 COT - HCBU - Framing N/A Not Ready wanted roof and shear
04/30/2025 COT - HCPL - Plumbing Above Ceiling N/A Not Applicable
06/13/2025 COT - HCBU - Firewall/Fire Barrier/Firestop N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0824-01519
Permit Description: Addition at the existing patio in an existing building for a liquid nitrogen generator. this is a 2% expansion. REV1_SHEETS A1 AND A2 - EXTERIOR WALL ASSEMBLY REVISED TO EIFS 3" IN LIEU OF STUCCO
Total Completed Inspections - 17
Date Description Inspector Results Comments
04/15/2025 COT - HCBU - Preslab Passed
04/15/2025 COT - HCBU - Exterior Clips/Sheathing Passed
04/15/2025 COT - HCBU - Roof Nailing Passed
04/30/2025 COT - HCEL - Electrical Above Ceiling Passed
04/30/2025 COT - HCEL - Electrical Intermediate Passed
04/30/2025 COT - HCBU - Framing Passed
04/30/2025 COT - HCEL - Electrical Progress Passed
04/30/2025 COT - HCME - Mechanical Intermediate Passed
06/13/2025 ENGR Engineering Final Passed
06/12/2025 TRSP - ROW - Final/Close-Out Passed
06/13/2025 COT - HCPL - Plumbing Final Passed
06/13/2025 COT - HCME - Mechanical Final Passed
06/13/2025 COT - HCEL - Electrical Final Passed
08/26/2025 COT - FCON - Fire - Final Passed
08/26/2025 COT - FCON - Sprinkler - Final Passed
12/04/2025 COT - HCBU - Building Final Passed
12/04/2025 COT - HCBU - CofO Passed

Documents

File Name Document Type  
REVISED - RESUBMIT OF SPECIAL INSPECTION-2025-11-24_V1.PDF DOCUMENTS VIEW
MED GAS SPC INSP LTR-2025-10-29_V1.PDF DOCUMENTS VIEW
2025 08 26 25 DELTA 2_V1.PDF DOCUMENTS VIEW
CATALINA DERM REV 2 NARRATIVE_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-CONS-2 PLAN SET_V1_V1.PDF DOCUMENTS VIEW