Permit: TC-COM-0823-01992
Permit Details
Apply Date:
08/15/2023
Applicant:
Samuel Lopez
Description:
Tenant Improvement with no Change of Use. All site conditions to remain as is.
Permit Reviews
Permit Number - TC-COM-0823-01992
Permit Status: Complete
Permit Description: Tenant Improvement with no Change of Use. All site conditions to remain as is.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/22/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 11/27/2023 | REQUIRES RESUBMIT |
11/14/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/14/2023 | REQUIRES RESUBMIT |
12/19/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.6 | 12/19/2023 | APPROVED |
08/16/2023 | COMMERCIAL REVIEW - FULL v.1 | 09/15/2023 | APPROVED |
11/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/21/2023 | REQUIRES RESUBMIT |
12/07/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.5 | 12/07/2023 | REQUIRES RESUBMIT |
12/05/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 12/06/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0823-01992
Permit Status: Complete
Permit Description: Tenant Improvement with no Change of Use. All site conditions to remain as is.
Date | Description | Comments |
---|---|---|
08/18/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
08/18/2023 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. | |
09/15/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
08/18/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-01992
Permite Description: Tenant Improvement with no Change of Use. All site conditions to remain as is.
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/17/2023 | COT - FCON - Sprinkler - Final | N/A | Not Applicable | |
11/17/2023 | COT - FCON - Alarm - Final | N/A | Not Applicable | |
COT - FCON - Fire - Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-01992
Permit Description: Tenant Improvement with no Change of Use. All site conditions to remain as is.
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/22/2023 | BULD - Electrical Clearance | Passed | ||
11/22/2023 | COT - BULD - SWG Clearance | Passed | ||
11/22/2023 | ENGR Engineering Final | Passed | ||
11/21/2023 | TRSP - ROW - Final/Close-Out | Passed | ||
12/08/2023 | COT - HCBU - Building Final | Passed | ||
12/28/2023 | COT - FCON - Fire - Final | Passed |