Permit: TC-COM-0823-01990
Permit Details
Apply Date:
08/15/2023
Applicant:
Scott Feltheim
Description:
New post-tension slab for tennis court, along with new fencing and curb. Also, a new ramp to gate opening.
Permit Reviews
Permit Number - TC-COM-0823-01990
Permit Status: Issued
Permit Description: New post-tension slab for tennis court, along with new fencing and curb. Also, a new ramp to gate opening.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/15/2023 | COMMERCIAL REVIEW - FULL v.1 | 09/18/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0823-01990
Permit Status: Issued
Permit Description: New post-tension slab for tennis court, along with new fencing and curb. Also, a new ramp to gate opening.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
09/18/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
09/18/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-COM-0823-01990
Permit Status: Issued
Permit Description: New post-tension slab for tennis court, along with new fencing and curb. Also, a new ramp to gate opening.
Date | Description | Comments |
---|---|---|
09/18/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0823-01990
Permite Description: New post-tension slab for tennis court, along with new fencing and curb. Also, a new ramp to gate opening.
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/13/2023 | COT - LCEL - Electrical Final | N/A | Not Applicable | |
11/13/2023 | ENGR Engineering Final | N/A | Partial Pass | Contractor poured the tennis court and removed existing sidewalk. I am poor and the contractor needed to call Lynn every two weeks for inspection. |
11/13/2023 | COT - LCBU - Building Final | N/A | Re-inspection required | 11/13/23: complete ramp and handrails per plan, waiting on Site Engineering final. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0823-01990
Permit Description: New post-tension slab for tennis court, along with new fencing and curb. Also, a new ramp to gate opening.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2023 | COT - LCBU - Preslab | Passed | Post tension cable system; Ok to place concrete. | |
02/06/2024 | ENGR Engineering Final | Passed | ||
02/07/2024 | COT - LCBU - Building Final | Passed |