Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
08/14/2023
Applicant:
Gabrielle Soto
Description:
This project is a tenant improvement effort for an existing shell space for a new restaurant use lease space.

Permit Reviews

Permit Number - TC-COM-0823-01981
Permit Status: Complete
Permit Description: This project is a tenant improvement effort for an existing shell space for a new restaurant use lease space.
Start Date Submittal Complete Date Status  
03/27/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/02/2024 APPROVED Review Details
09/14/2023 COMMERCIAL REVIEW - FULL v.2 09/21/2023 APPROVED Review Details
04/03/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/08/2024 APPROVED Review Details
03/21/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/25/2024 APPROVED Review Details
09/21/2023 RESTAMP - COMMERCIAL v.1 09/25/2023 APPROVED Review Details
08/14/2023 COMMERCIAL REVIEW - FULL v.1 09/13/2023 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0823-01981
Permit Status: Complete
Permit Description: This project is a tenant improvement effort for an existing shell space for a new restaurant use lease space.
Date Description Comments
09/21/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
08/14/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/27/2024 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
03/27/2024 Grease Interceptor Designs must be submitted and approved prior to ...
03/27/2024 Sign permit associated with this project has open inspections. Please schedule inspections.
03/27/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0823-01981
Permite Description: This project is a tenant improvement effort for an existing shell space for a new restaurant use lease space.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
02/21/2024 COT - HCBU - Building Above Ceiling N/A Not Ready Call finals
03/27/2024 COT - HCBU - TCO N/A Not Applicable
03/27/2024 COT - FCON - Alarm - Final N/A Not Applicable
03/27/2024 COT - HCPL - Gas Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0823-01981
Permit Description: This project is a tenant improvement effort for an existing shell space for a new restaurant use lease space.
Total Completed Inspections - 24
Date Description Inspector Results Comments
01/26/2024 COT - HCPL - Sewer Passed 1/26/24: plumbing underground per plan ok to backfill. Sewer connection made to existing grease interceptor
01/29/2024 COT - HCBU - Preslab Passed
02/06/2024 COT - HCBU - Framing Passed ok to one side
02/07/2024 COT - HCPL - Plumbing Intermediate Passed
02/21/2024 COT - HCEL - Electrical Above Ceiling Passed
02/21/2024 COT - HCPL - Plumbing Above Ceiling Passed
02/21/2024 COT - HCME - Mechanical Above Ceiling Passed
02/29/2024 BULD - Electrical Clearance Passed
02/29/2024 COT - BULD - SWG Clearance Passed
02/29/2024 COT - HCBU - Building Above Ceiling Passed
03/12/2024 COT - HCEL - Electrical Final Passed
03/13/2024 COT - FCON - Fire - Final Passed
03/20/2024 ENGR Engineering Final Passed
03/21/2024 COT - HCPL - Plumbing Final Passed
03/25/2024 TRSP - ROW - Final/Close-Out Passed
03/21/2024 COT - HCBU - Building Final Passed ok for C/O
03/21/2024 COT - HCME - Mechanical Final Passed
03/27/2024 COT - FCON - Sprinkler - Final Passed Passed by C. Basaldua
03/27/2024 COT - LCPL - Plumbing Progress Passed
03/27/2024 COT - HCBU - Building Progress Passed
03/27/2024 COT - HCEL - Electrical Intermediate Passed
03/27/2024 COT - HCME - Mechanical Intermediate Passed
03/27/2024 COT - HCPL - Gas Pressure Test Passed
03/27/2024 COT - HCPL - Gas Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
GREASE TRAP INFORMATION_V1.PDF DOCUMENTS VIEW
WILBER ENTERPRISES - EINSTEIN BAGELS LAB RESULTS-2024-03-26_V1.PDF DOCUMENTS VIEW
EINSTEIN BROS. BAGELS - TAB REPORT (1)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-23168_EINSTEIN BROS BAGELS_TUCSON AZ_FULL SET_V1.PDF DOCUMENTS VIEW
23168.000 MATZ 01_V1.PDF DOCUMENTS VIEW
23168.000 MATZ 01_V1.PDF DOCUMENTS VIEW
CONS-23186_EINSTEINS BROS BAGELS_TUCSON AZ_FULL SET_V1.PDF DOCUMENTS VIEW