Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
08/14/2023
Applicant:
Kim Filuk
Description:
Coffee Wow Phase 1: Equipment and millwork modifications to existing coffee bar and lid bar.

Permit Reviews

Permit Number - TC-COM-0823-01972
Permit Status: Complete
Permit Description: Coffee Wow Phase 1: Equipment and millwork modifications to existing coffee bar and lid bar.
Start Date Submittal Complete Date Status  
03/16/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/21/2024 APPROVED Review Details
08/14/2023 COMMERCIAL REVIEW - FULL v.1 09/18/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0823-01972
Permit Status: Complete
Permit Description: Coffee Wow Phase 1: Equipment and millwork modifications to existing coffee bar and lid bar.
Date Description Comments
09/18/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
09/18/2023 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0823-01972
Permite Description: Coffee Wow Phase 1: Equipment and millwork modifications to existing coffee bar and lid bar.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/13/2023 COT - LCME - Mechanical Final N/A Not Applicable
10/13/2023 COT - BULD - SWG Clearance N/A Not Applicable
10/13/2023 BULD - Electrical Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0823-01972
Permit Description: Coffee Wow Phase 1: Equipment and millwork modifications to existing coffee bar and lid bar.
Total Completed Inspections - 7
Date Description Inspector Results Comments
10/13/2023 COT - FCON - Fire - Final Passed
10/13/2023 COT - LCBU - Building Final Passed
10/13/2023 COT - LCEL - Electrical Final Passed
10/13/2023 COT - LCPL - Plumbing Final Passed
10/13/2023 ENGR Engineering Final Passed
10/13/2023 TRSP - ROW - Final/Close-Out Passed
10/13/2023 COT - LCEL - Electrical Above Ceiling Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-05-1490 GEN2.5 COFFEEWOW PHASE 1_V1.PDF DOCUMENTS VIEW