Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
08/10/2023
Applicant:
Eric Knowles
Description:
Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.

Permit Reviews

Permit Number - TC-COM-0823-01957
Permit Status: Issued
Permit Description: Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Start Date Submittal Complete Date Status  
08/17/2023 COMMERCIAL REVIEW - FULL v.2 09/15/2023 REQUIRES RESUBMIT Review Details
08/10/2023 COMMERCIAL REVIEW - FULL v.1 08/16/2023 REQUIRES RESUBMIT Review Details
12/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/23/2024 APPROVED Review Details
09/26/2023 COMMERCIAL REVIEW - FULL v.3 10/18/2023 REQUIRES RESUBMIT Review Details
01/29/2024 COMMERCIAL REVIEW - FULL v.4 03/01/2024 APPROVED Review Details
03/01/2024 RESTAMP - COMMERCIAL v.1 03/01/2024 APPROVED Review Details
01/02/2025 COMMERCIAL REVIEW - FULL v.1 01/24/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0823-01957
Permit Status: Issued
Permit Description: Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Total Outstanding Activity Conditions - 25
Date Name
02/11/2025 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
02/11/2025 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
02/11/2025 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
02/11/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/11/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/11/2025 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
02/11/2025 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
02/11/2025 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
02/11/2025 SPECIAL INSPECTION FOR ??? IS REQUIRED
02/11/2025 Stair Designs must be submitted and approved prior to...
02/11/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
02/11/2025 WATER STERILIZATION REPORT IS REQUIRED.
12/03/2024 AIR BALANCING REPORT IS REQUIRED.
12/03/2024 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
12/03/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/03/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/03/2024 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
12/03/2024 EFIC Application Water-Resistive Barrier Coating Designs must be submitted and approved prior to final.
12/03/2024 Sheer wall bracing and seismic design Designs must be submitted and approved prior to final.
12/03/2024 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
12/03/2024 NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL PDEQ ISSUES A DISCHARGE AUTHORIZATION (D.A.) FOR THE PRIVATE SEWER #P22SD00051 BUILT FOR THE CAR WASH AT 1505 W VALENCIA ROAD AND THE TAKE 5 OIL CHANGE AT 1511 W VALENCIA ROAD. CONNECTING TO PRIVATE SEWER MANHOLE #P22SD00051 WITH "NO" DISCHARGE AUTHORIZATION (D. A.) BY THE ADJACENT CAR WASH AT 1505 W VALENCIA ROAD FOR 1505 W VALENCIA ROAD AND 1511 W VALENCIA ROAD
12/03/2024 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
12/03/2024 Stair Designs must be submitted and approved prior to...
12/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
12/03/2024 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0823-01957
Permit Status: Issued
Permit Description: Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Date Description Comments
08/10/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
03/01/2024 Prior to Issuance: This project requires issuance of a Development Package (DP) TD-DEV-0623-00260 permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
08/10/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0823-01957
Permite Description: Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
11/15/2024 COT - HCEL - Electrical Underground N/A Partial Pass 11/15/24: electrical underground at slab passed ok to proceed.
12/20/2024 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass 12/20/24: reinforcement at slab per plans ok to proceed
12/20/2024 COT - HCBU - Preslab N/A Partial Pass 12/9/24: reinforcement at trench sections per plan ok to pour 6" of concrete.
12/20/24: reinforcement at slab passed ok to proceed with pour
12/20/2024 COT - HCEL - Grounding/Bonding N/A Partial Pass 12/20/24: partial for UFER only
12/20/2024 COT - HCPL - Rough Soil N/A Partial Pass Plumbing in slab approved. Okay to backfill. Shading required. 10/31/2024
12/20/24: pre slab passed ok to proceed.
02/13/2025 COT - HCBU - Interior Shear Bracing N/A Partial Pass 1/30/25: Partial pass for soffit area north east corner of building. Ok to start sheathing in progress area.
2/13/25: exterior clip and sheathing passed.
ENGR Engineering Final N/A Not Ready This trash enclosure is part of the Development Package and inspected accordingly.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0823-01957
Permit Description: Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Total Completed Inspections - 2
Date Description Inspector Results Comments
02/10/2025 COT - HCBU - Roof Nailing Passed 2-10-25, roof nailing approved-Okay to dry in roof.
02/13/2025 COT - HCBU - Exterior Clips/Sheathing Passed 1/30/25: Partial pass for soffit area north east corner of building. Ok to start sheathing in progress area.
2/13/25: exterior clip and sheathing passed.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONSTRUCTION REVISION NARRATIVE ELECTRICAL E2.01_V1.PDF DOCUMENTS VIEW
STAIRS_V1.PDF DOCUMENTS VIEW
TC-COM-0823-01957 VAPOR BARRIER DEFERRED SUBMITTAL_V1.PDF DOCUMENTS VIEW
TRUSS DRAWINGS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-TAKE 5 - TUCSON - VALENCIA ROAD - REV 02 - 01.25.2024_V3.PDF DOCUMENTS VIEW
ALTA SURVEY 4.5_V2_V1.PDF DOCUMENTS VIEW
GEOTEC REPORT_V1.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS PACKET_V1.PDF DOCUMENTS VIEW
TAKE 5- WEST VALENICA_ASSESMENT REPORT I ESA_V1.PDF DOCUMENTS VIEW