Permit: TC-COM-0823-01957
Permit Details
Apply Date:
08/10/2023
Applicant:
Eric Knowles
Description:
Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Permit Reviews
Permit Number - TC-COM-0823-01957
Permit Status: Issued
Permit Description: Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/17/2023 | COMMERCIAL REVIEW - FULL v.2 | 09/15/2023 | REQUIRES RESUBMIT |
08/10/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/16/2023 | REQUIRES RESUBMIT |
12/11/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/23/2024 | APPROVED |
09/26/2023 | COMMERCIAL REVIEW - FULL v.3 | 10/18/2023 | REQUIRES RESUBMIT |
01/29/2024 | COMMERCIAL REVIEW - FULL v.4 | 03/01/2024 | APPROVED |
03/01/2024 | RESTAMP - COMMERCIAL v.1 | 03/01/2024 | APPROVED |
01/02/2025 | COMMERCIAL REVIEW - FULL v.1 | 01/24/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0823-01957
Permit Status: Issued
Permit Description: Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Total Outstanding Activity Conditions - 25
Date | Name |
---|---|
02/11/2025 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
02/11/2025 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
02/11/2025 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
02/11/2025 | SPECIAL INSPECTION FOR ??? IS REQUIRED |
02/11/2025 | Stair Designs must be submitted and approved prior to... |
02/11/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
02/11/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
12/03/2024 | AIR BALANCING REPORT IS REQUIRED. |
12/03/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
12/03/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
12/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
12/03/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
12/03/2024 | EFIC Application Water-Resistive Barrier Coating Designs must be submitted and approved prior to final. |
12/03/2024 | Sheer wall bracing and seismic design Designs must be submitted and approved prior to final. |
12/03/2024 | SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED. |
12/03/2024 | NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL PDEQ ISSUES A DISCHARGE AUTHORIZATION (D.A.) FOR THE PRIVATE SEWER #P22SD00051 BUILT FOR THE CAR WASH AT 1505 W VALENCIA ROAD AND THE TAKE 5 OIL CHANGE AT 1511 W VALENCIA ROAD. CONNECTING TO PRIVATE SEWER MANHOLE #P22SD00051 WITH "NO" DISCHARGE AUTHORIZATION (D. A.) BY THE ADJACENT CAR WASH AT 1505 W VALENCIA ROAD FOR 1505 W VALENCIA ROAD AND 1511 W VALENCIA ROAD |
12/03/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
12/03/2024 | Stair Designs must be submitted and approved prior to... |
12/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
12/03/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0823-01957
Permit Status: Issued
Permit Description: Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Date | Description | Comments |
---|---|---|
08/10/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
03/01/2024 | Prior to Issuance: This project requires issuance of a Development Package (DP) TD-DEV-0623-00260 permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
08/10/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-COM-0823-01957
Permite Description: Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/15/2024 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 11/15/24: electrical underground at slab passed ok to proceed. |
12/20/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 12/20/24: reinforcement at slab per plans ok to proceed |
12/20/2024 | COT - HCBU - Preslab | N/A | Partial Pass | 12/9/24: reinforcement at trench sections per plan ok to pour 6" of concrete. 12/20/24: reinforcement at slab passed ok to proceed with pour |
12/20/2024 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | 12/20/24: partial for UFER only |
12/20/2024 | COT - HCPL - Rough Soil | N/A | Partial Pass | Plumbing in slab approved. Okay to backfill. Shading required. 10/31/2024 12/20/24: pre slab passed ok to proceed. |
02/13/2025 | COT - HCBU - Interior Shear Bracing | N/A | Partial Pass | 1/30/25: Partial pass for soffit area north east corner of building. Ok to start sheathing in progress area. 2/13/25: exterior clip and sheathing passed. |
ENGR Engineering Final | N/A | Not Ready | This trash enclosure is part of the Development Package and inspected accordingly. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0823-01957
Permit Description: Ground up construction, including site work of Single Story, 3 Service Bay Take 5 Oil Change with restroom, storage and support space.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/10/2025 | COT - HCBU - Roof Nailing | Passed | 2-10-25, roof nailing approved-Okay to dry in roof. | |
02/13/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | 1/30/25: Partial pass for soffit area north east corner of building. Ok to start sheathing in progress area. 2/13/25: exterior clip and sheathing passed. |