TENANT IMPROVEMENT OF EXISTING GREY BOX SHELL, ADDING MEDICAL EXAM ROOMS, OFFICES, BREAK ROOM, LOBBY W/ CHECK IN, ULTRASOUND ROOMS, STORAGE,POINT OF CARE, BLOOD DRAW/LAB, AND RESTROOMS. UTILIZING EXISTING MECHANICAL UNITS WITH NEW DUCTS AND FLOOR CUTS FOR NEW PLUMBING.
Permit Reviews
Permit Number - TC-COM-0823-01939
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT OF EXISTING GREY BOX SHELL, ADDING MEDICAL EXAM ROOMS, OFFICES, BREAK ROOM, LOBBY W/ CHECK IN, ULTRASOUND ROOMS, STORAGE,POINT OF CARE, BLOOD DRAW/LAB, AND RESTROOMS. UTILIZING EXISTING MECHANICAL UNITS WITH NEW DUCTS AND FLOOR CUTS FOR NEW PLUMBING.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/13/2023 | RESTAMP - COMMERCIAL v.1 | 09/14/2023 | APPROVED |
12/28/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/29/2023 | APPROVED |
01/11/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/11/2024 | APPROVED |
01/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/03/2024 | APPROVED |
11/16/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/20/2023 | REQUIRES RESUBMIT |
09/12/2023 | COMMERCIAL REVIEW - FULL v.2 | 09/12/2023 | APPROVED |
08/09/2023 | COMMERCIAL REVIEW - FULL v.1 | 09/12/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0823-01939
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT OF EXISTING GREY BOX SHELL, ADDING MEDICAL EXAM ROOMS, OFFICES, BREAK ROOM, LOBBY W/ CHECK IN, ULTRASOUND ROOMS, STORAGE,POINT OF CARE, BLOOD DRAW/LAB, AND RESTROOMS. UTILIZING EXISTING MECHANICAL UNITS WITH NEW DUCTS AND FLOOR CUTS FOR NEW PLUMBING.
Date | Description | Comments |
---|---|---|
08/24/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
08/24/2023 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. | |
08/24/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-01939
Permite Description: TENANT IMPROVEMENT OF EXISTING GREY BOX SHELL, ADDING MEDICAL EXAM ROOMS, OFFICES, BREAK ROOM, LOBBY W/ CHECK IN, ULTRASOUND ROOMS, STORAGE,POINT OF CARE, BLOOD DRAW/LAB, AND RESTROOMS. UTILIZING EXISTING MECHANICAL UNITS WITH NEW DUCTS AND FLOOR CUTS FOR NEW PLUMBING.
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/09/2023 | COT - HCME - Venting | N/A | Not Applicable | |
11/09/2023 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 11/9/23: do not cover any floor/ceiling penetrations until the architect is RFI about fire stopping. |
11/28/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
12/22/2023 | BULD - Electrical Clearance | N/A | Not Applicable | Electrical clearance not required. This is a remodel of existing space and meter was pulled or replaced. |
12/28/2023 | COT - HCEL - Electrical Final | N/A | Re-inspection required | 12/28/23: receptacles within 6 ft of water fixture needs to be GFCI protected receptacles above 42" need to be GFCI protected. Missing smoke detectors in hallway and rooms |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-01939
Permit Description: TENANT IMPROVEMENT OF EXISTING GREY BOX SHELL, ADDING MEDICAL EXAM ROOMS, OFFICES, BREAK ROOM, LOBBY W/ CHECK IN, ULTRASOUND ROOMS, STORAGE,POINT OF CARE, BLOOD DRAW/LAB, AND RESTROOMS. UTILIZING EXISTING MECHANICAL UNITS WITH NEW DUCTS AND FLOOR CUTS FOR NEW PLUMBING.
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/09/2023 | COT - HCBU - Framing | Passed | ||
11/09/2023 | COT - HCEL - Electrical Intermediate | Passed | ||
11/09/2023 | COT - HCME - Mechanical Above Ceiling | Passed | ||
11/28/2023 | COT - HCBU - Building Progress | Passed | ||
11/28/2023 | COT - HCME - Mechanical Progress | Passed | ||
11/28/2023 | COT - HCPL - Plumbing Progress | Passed | ||
11/28/2023 | COT - HCEL - Electrical Progress | Passed | ||
11/28/2023 | COT - HCBU - Interior Shear Bracing | Passed | 11/28/23: all walls approved to tape. | |
12/08/2023 | COT - HCPL - Plumbing Above Ceiling | Passed | 12/8/23: 20 penetrations in the floor/ceiling assembly are fire chalked and approved. | |
12/22/2023 | COT - HCEL - Electrical Above Ceiling | Passed | 12/22/23: Electrical trim out above ceiling is complete, all j-boxes are properly installed with covers and labeled as to what circuits are ran in them. Okay to install ceiling tiles in grid ceiling. | |
12/22/2023 | ENGR Engineering Final | Passed | ||
12/22/2023 | COT - HCBU - Building Above Ceiling | Passed | 12-22-23: Mechanical rough-in and trim out are complete. Electrical trim out above ceiling is complete, all j-boxes are properly installed with covers and labeled as to what circuits are ran in them. Okay to install ceiling tiles in grid ceiling. | |
12/22/2023 | COT - HCEL - Grounding/Bonding | Passed | New transformer is properly grounded to building steel. Ground bus for IT equipment is installed and wired to the ground cable from transformer to building steel. | |
12/22/2023 | COT - HCME - Mechanical Intermediate | Passed | 12-22-23: Mechanical rough-in and trim out are complete. Okay to install ceiling tiles in grid ceiling. | |
12/28/2023 | COT - HCME - Mechanical Final | Passed | ||
12/28/2023 | COT - HCPL - Plumbing Final | Passed | ||
12/29/2023 | COT - FCON - Alarm - Final | Passed | ||
12/29/2023 | COT - FCON - Fire - Final | Passed | ||
01/02/2024 | COT - HCEL - Electrical Final | Passed | This inspection is to include Plumbing Intermediate and Electric Above Ceiling. | |
01/11/2024 | COT - HCBU - CofO | Passed | ||
01/11/2024 | COT - HCBU - Building Final | Passed | ||
01/11/2024 | COT - FCON - Sprinkler - Final | Passed | ||
01/09/2024 | TRSP - ROW - Final/Close-Out | Passed |