Permit: TC-COM-0823-01936
Permit Details
Apply Date:
08/08/2023
Applicant:
Kelly Rehm
Description:
The Edge School 58.0kW PV is 116 modules and 2 grid-tied inverters on a new steel parking canopy. Connects to existing TEP service at meter# 157598571. 116 modules
Permit Reviews
Permit Number - TC-COM-0823-01936
Permit Status: Complete
Permit Description: The Edge School 58.0kW PV is 116 modules and 2 grid-tied inverters on a new steel parking canopy. Connects to existing TEP service at meter# 157598571.
116 modules
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/18/2023 | COMMERCIAL REVIEW - FULL v.2 | 10/13/2023 | APPROVED |
| 08/09/2023 | COMMERCIAL REVIEW - FULL v.1 | 09/13/2023 | REQUIRES RESUBMIT |
| 10/13/2023 | RESTAMP - COMMERCIAL v.1 | 10/16/2023 | APPROVED |
| 11/20/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/20/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0823-01936
Permit Status: Complete
Permit Description: The Edge School 58.0kW PV is 116 modules and 2 grid-tied inverters on a new steel parking canopy. Connects to existing TEP service at meter# 157598571.
116 modules
| Date | Description | Comments |
|---|---|---|
| 09/13/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 09/13/2023 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 09/13/2023 | SPECIAL INSPECTION FOR PILING, DRILLED PIERS AND CAISSONS IS REQUIRED. | |
| 09/13/2023 | SPECIAL INSPECTION FOR SPECIAL MOMENT RESISTING STEEL FRAMES IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-01936
Permit Description: The Edge School 58.0kW PV is 116 modules and 2 grid-tied inverters on a new steel parking canopy. Connects to existing TEP service at meter# 157598571.
116 modules
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2023 | COT - CSOL - Grounding/Bonding Solar Project | Passed | Approved min 10' column depth | |
| 11/03/2023 | COT - LCBU - Building Progress | Passed | Approved column foundations per engineers design and SI report, okay for concrete placement | |
| 12/06/2023 | COT - CSOL - Electrical Final Solar Project | Passed | 12/6/23 DGC clearance for meter#15759871 | |
| 12/06/2023 | COT - FCON - Fire - Final | Passed | solar panels approved. | |
| 12/06/2023 | COT - LCBU - Building Final | Passed | 12/6/23 DGC clearance for meter#15759871 | |
| 12/06/2023 | COT - CSOL - Electrical Intermediate Solar Project | Passed | 12/6/23 DGC clearance for meter#15759871 | |
| 12/06/2023 | COT - CSOL - Electrical Underground Solar Project | Passed | 12/6/23 DGC clearance for meter#15759871 | |
| 12/06/2023 | COT - CSOL - Outdoor Lighting Solar Project | Passed | 12/6/23 DGC clearance for meter#15759871 | |
| 12/06/2023 | BULD - Electrical Clearance | Passed | 12/6/23 DGC clearance for meter#15759871 |