Permit: TC-COM-0823-01875
Permit Details
Apply Date:
08/01/2023
Applicant:
Kenra Whitten
Description:
Tenant alteration of suite E104. First generation tenant - no demo work required. new interior walls, new finishes, new ceilings and lighting, new restroom, mop sink and drinking fountain. New electrical panels and distribution, new hvac distribution.
Permit Reviews
Permit Number - TC-COM-0823-01875
Permit Status: Complete
Permit Description: Tenant alteration of suite E104. First generation tenant - no demo work required. new interior walls, new finishes, new ceilings and lighting, new restroom, mop sink and drinking fountain. New electrical panels and distribution, new hvac distribution.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/07/2024 | REQUIRES RESUBMIT |
10/18/2023 | RESTAMP - COMMERCIAL v.1 | 10/19/2023 | APPROVED |
03/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/15/2024 | APPROVED |
08/04/2023 | COMMERCIAL REVIEW - FULL v.1 | 09/07/2023 | APPROVED |
03/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/18/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0823-01875
Permit Status: Complete
Permit Description: Tenant alteration of suite E104. First generation tenant - no demo work required. new interior walls, new finishes, new ceilings and lighting, new restroom, mop sink and drinking fountain. New electrical panels and distribution, new hvac distribution.
Date | Description | Comments |
---|---|---|
08/04/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
08/08/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
08/04/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
08/04/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/08/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-01875
Permite Description: Tenant alteration of suite E104. First generation tenant - no demo work required. new interior walls, new finishes, new ceilings and lighting, new restroom, mop sink and drinking fountain. New electrical panels and distribution, new hvac distribution.
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
COT - FCON - Fire - Final | N/A | Not Ready | no power to exit signs | |
01/03/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | |
03/08/2024 | COT - HCME - Venting | N/A | Not Applicable | |
12/27/2023 | COT - HCEL - Electrical Progress | N/A | Partial Pass | ok to one side |
03/08/2024 | COT - HCBU - Sustainability | N/A | Not Applicable | |
12/05/2023 | COT - HCBU - Building Progress | N/A | Partial Pass | 12/5/23 ok to place concrete on slab cuts |
03/18/2024 | TRSP - ROW - Final/Close-Out | N/A | Re-inspection required | not for row. wrong inspector. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0823-01875
Permit Description: Tenant alteration of suite E104. First generation tenant - no demo work required. new interior walls, new finishes, new ceilings and lighting, new restroom, mop sink and drinking fountain. New electrical panels and distribution, new hvac distribution.
Total Completed Inspections - 25