Status:
Complete
Type:
Commercial Building
Address NEW:
5151 E BROADWAY BL
Apply Date:
08/01/2023
Applicant:
Ashley Benjamin
Description:
Tenant Improvement

Permit Reviews

Permit Number - TC-COM-0823-01872
Permit Status: Complete
Permit Description: Tenant Improvement
Start Date Submittal Complete Date Status  
08/03/2023 COMMERCIAL REVIEW - FULL v.1 11/22/2023 APPROVED Review Details
03/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/15/2024 APPROVED Review Details
11/22/2023 RESTAMP - COMMERCIAL v.1 11/22/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0823-01872
Permit Status: Complete
Permit Description: Tenant Improvement
Date Description Comments
11/21/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0823-01872
Permite Description: Tenant Improvement
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/20/2024 ENGR Engineering Final N/A Not Ready Still under construction at this time, Gym Equipment is being Installed by others without the Fire Inspections being Approved at this time. We have spoken to Costa at 520-404-1347, and Rob Caylor with Caylor Construction and advised them that a Level 2 Temporary Certificate of Occupancy is required to be in place before anyone other than the Contractor is allowed within the Construction Site. Engineering will be good for TCO Level 2 only after all necessary Inspections have been Approved by the Fire Inspection Department.

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0823-01872
Permit Description: Tenant Improvement
Total Completed Inspections - 10
Date Description Inspector Results Comments
01/11/2024 COT - HCME - Mechanical Intermediate Passed
01/16/2024 COT - HCEL - Electrical Intermediate Passed
02/15/2024 COT - HCEL - Electrical Final Passed
02/15/2024 COT - HCME - Mechanical Final Passed
02/16/2024 COT - FCON - Sprinkler - Final Passed
02/23/2024 TRSP - ROW - Final/Close-Out Passed
02/20/2024 COT - HCBU - Building Final Passed
02/23/2024 COT - FCON - Alarm - Final Passed
02/23/2024 COT - FCON - Fire - Final Passed
02/23/2024 ENGR Engineering Final Passed