Permit: TC-COM-0726-01142
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
2525 S CRAYCROFT RD
Address NEW:
2525 S CRAYCROFT RD
Apply Date:
07/21/2026
Applicant:
Luis Garcia
Description:
Relocate and install kitchen equipments.
Permit Reviews
Permit Number - TC-COM-0726-01142
Permit Status: Inspections
Permit Description: Relocate and install kitchen equipments.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/05/2026 | ADMINISTRATIVE v.1 | 08/05/2026 | REQUIRES RESUBMIT |
| 07/22/2026 | COMMERCIAL REVIEW - LIMITED v.1 | 08/05/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0726-01142
Permit Status: Inspections
Permit Description: Relocate and install kitchen equipments.
| Date | Description | Comments |
|---|---|---|
| 08/05/2026 | Pre-Issuance - Required Documents - Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/22/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0726-01142
Permite Description: Relocate and install kitchen equipments.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/27/2026 | COT - FCON - Fire - Final | N/A | Not Ready | this was a pre construction meeting the ansul tank cabinet is not ready for inspection |
| 09/01/2026 | COT - LCEL - Electrical Final | N/A | Partial Pass | Not ready GFCI receptacle for freezer is too high and not accessible. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0726-01142
Permit Description: Relocate and install kitchen equipments.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2026 | COT - LCBU - Building Final | Passed |