Permit: TC-COM-0726-01044
Permit Details
Status:
In Review
Type:
Commercial Building
Address:
1800 W VALENCIA RD
Address NEW:
1800 W VALENCIA RD
Apply Date:
07/08/2026
Applicant:
Kari Pizzini
Description:
Main Roof: Leave the existing roofing system in place. Temporarily, by section, move over and stockpile the rock ballast, then install a new loose-laid TPO membrane with heat-welded seams. After each section of TPO installation, replace the rock ballast over the new membrane. The contractor’s canopy and garden center roofs are mechanically attached TPO systems (unlike the main ballasted roof) and currently have two layers of membrane. In these areas, both existing membrane layers will be removed and replaced with a new TPO membrane. The existing insulation may remain in place, provided it is confirmed to be dry.
Permit Reviews
Permit Number - TC-COM-0726-01044
Permit Status: In review
Permit Description: Main Roof: Leave the existing roofing system in place. Temporarily, by section, move over and stockpile the rock ballast, then install a new loose-laid TPO membrane with heat-welded seams. After each section of TPO installation, replace the rock ballast over the new membrane.
The contractor’s canopy and garden center roofs are mechanically attached TPO systems (unlike the main ballasted roof) and currently have two layers of membrane. In these areas, both existing membrane layers will be removed and replaced with a new TPO membrane.
The existing insulation may remain in place, provided it is confirmed to be dry.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/08/2026 | COMMERCIAL REVIEW - FULL v.1 | 07/08/2026 | REQUIRES RESUBMIT |
| 07/09/2026 | COMMERCIAL REVIEW - FULL v.2 | N/A | IN REVIEW |
Conditions
Permit Number - TC-COM-0726-01044
Permit Status: In review
Permit Description: Main Roof: Leave the existing roofing system in place. Temporarily, by section, move over and stockpile the rock ballast, then install a new loose-laid TPO membrane with heat-welded seams. After each section of TPO installation, replace the rock ballast over the new membrane.
The contractor’s canopy and garden center roofs are mechanically attached TPO systems (unlike the main ballasted roof) and currently have two layers of membrane. In these areas, both existing membrane layers will be removed and replaced with a new TPO membrane.
The existing insulation may remain in place, provided it is confirmed to be dry.
| Date | Description | Comments |
|---|---|---|
| 07/08/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/08/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |