Permit: TC-COM-0726-01031
Permit Details
Apply Date:
07/03/2026
Applicant:
Kathy Kline
Description:
EXISTING BUILDING TO RECEIVE FULL T.I. WITH CHANGE OF USE FROM MERCANTILE TO RESTAURANT.
Permit Reviews
Permit Number - TC-COM-0726-01031
Permit Status: Inspections
Permit Description: EXISTING BUILDING TO RECEIVE FULL T.I. WITH CHANGE OF USE FROM MERCANTILE TO RESTAURANT.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/21/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/22/2026 | APPROVED |
| 09/23/2026 | ADMINISTRATIVE v.1 | 09/23/2026 | REQUIRES RESUBMIT |
| 09/03/2026 | COMMERCIAL REVIEW - FULL v.2 | 09/23/2026 | APPROVED |
| 10/26/2026 | ADMINISTRATIVE v.2 | N/A | APPROVED |
| 07/07/2026 | COMMERCIAL REVIEW - FULL v.1 | 07/29/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0726-01031
Permit Status: Inspections
Permit Description: EXISTING BUILDING TO RECEIVE FULL T.I. WITH CHANGE OF USE FROM MERCANTILE TO RESTAURANT.
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 07/17/2026 | AIR BALANCING REPORT IS REQUIRED. |
| 07/17/2026 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
| 07/17/2026 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 07/17/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 07/17/2026 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 09/22/2026 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0726-01031
Permit Status: Inspections
Permit Description: EXISTING BUILDING TO RECEIVE FULL T.I. WITH CHANGE OF USE FROM MERCANTILE TO RESTAURANT.
| Date | Description | Comments |
|---|---|---|
| 07/07/2026 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/07/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0726-01031
Permite Description: EXISTING BUILDING TO RECEIVE FULL T.I. WITH CHANGE OF USE FROM MERCANTILE TO RESTAURANT.
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2026 | COT - HCPL - Rough Soil | N/A | Partial Pass | Inside building. |
| 10/28/2026 | COT - HCBU - Firewall/Fire Barrier/Firestop | N/A | Partial Pass | South section of drywall nailing only. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0726-01031
Permit Description: EXISTING BUILDING TO RECEIVE FULL T.I. WITH CHANGE OF USE FROM MERCANTILE TO RESTAURANT.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2026 | COT - HCEL - Electrical Underground | Passed |