Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Address:
125 S LINDA AV
Address NEW:
125 S LINDA AV
Apply Date:
07/25/2025
Applicant:
Ben Rogers
Description:
REPLACEMENT OF EXISTING GAS-FIRED HEAT PUMPS WITH ELECTRIC HEAT PUMPS

Permit Reviews

Permit Number - TC-COM-0725-01412
Permit Status: Inspections
Permit Description: REPLACEMENT OF EXISTING GAS-FIRED HEAT PUMPS WITH ELECTRIC HEAT PUMPS
Start Date Submittal Complete Date Status  
08/12/2025 COMMERCIAL PDSD SIMPLE REVIEW v.2 08/14/2025 REQUIRES RESUBMIT Review Details
08/21/2025 RESTAMP - COMMERCIAL v.1 08/22/2025 APPROVED Review Details
07/30/2025 COMMERCIAL PDSD SIMPLE REVIEW v.1 08/04/2025 REQUIRES RESUBMIT Review Details
08/20/2025 COMMERCIAL PDSD SIMPLE REVIEW v.3 08/21/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0725-01412
Permit Status: Inspections
Permit Description: REPLACEMENT OF EXISTING GAS-FIRED HEAT PUMPS WITH ELECTRIC HEAT PUMPS
Total Outstanding Activity Conditions - 1
Date Name
08/14/2025 A COMMISSIONING REPORT (INCLUDING AN AIR BALANCE REPORT) IS REQUIRED.

Conditions

Permit Number - TC-COM-0725-01412
Permit Status: Inspections
Permit Description: REPLACEMENT OF EXISTING GAS-FIRED HEAT PUMPS WITH ELECTRIC HEAT PUMPS
Date Description Comments
07/25/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0725-01412
Permit Description: REPLACEMENT OF EXISTING GAS-FIRED HEAT PUMPS WITH ELECTRIC HEAT PUMPS
Total Completed Inspections - 1
Date Description Inspector Results Comments
10/23/2025 COT - LCEL - Electrical Intermediate Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
25-08-20_SENTINAL PLAZA HEAT PUMP REPLACEMENT_CM_MEP_PR1_V2.PDF DOCUMENTS VIEW
25-08-20_SENTINELPLAZAMECHREPORT_V1.PDF DOCUMENTS VIEW