Permit: TC-COM-0725-01379
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
3200 N ORACLE RD
Address NEW:
3200 N ORACLE RD
Apply Date:
07/17/2025
Applicant:
Jaris Brenneman
Description:
Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls, parking, sidewalks or landscape.
Permit Reviews
Permit Number - TC-COM-0725-01379
Permit Status: Inspections complete
Permit Description: Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls, parking, sidewalks or landscape.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/18/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 08/01/2025 | APPROVED |
| 04/09/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/10/2026 | APPROVED |
Conditions
Permit Number - TC-COM-0725-01379
Permit Status: Inspections complete
Permit Description: Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls, parking, sidewalks or landscape.
| Date | Description | Comments |
|---|---|---|
| 07/18/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0725-01379
Permite Description: Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls, parking, sidewalks or landscape.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0725-01379
Permit Description: Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls, parking, sidewalks or landscape.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2026 | COT - LCBU - Preslab | Passed | ||
| 04/07/2026 | COT - LCEL - Electrical Intermediate | Passed | ||
| 04/13/2026 | COT - LCEL - Electrical Above Ceiling | Passed | ||
| 04/13/2026 | COT - LCBU - Building Final | Passed | ||
| 04/13/2026 | COT - LCME - Mechanical Final | Passed | ||
| 04/13/2026 | COT - LCPL - Plumbing Final | Passed | ||
| 04/13/2026 | COT - LCEL - Electrical Final | Passed | ||
| 06/10/2026 | COT - FCON - Fire - Final | Passed | ||
| 06/10/2026 | TRSP - ROW - Final/Close-Out | Passed |