Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Address NEW:
6601 S SAN FERNANDO RD
Apply Date:
07/15/2025
Applicant:
Alicia Simmons
Description:
INSTALL 3 NEW SHADE STRUCTURES AS SHOWN IN DEVELOPMENT PLAN TD-DEV-00225-00052

Permit Reviews

Permit Number - TC-COM-0725-01368
Permit Status: Inspections complete
Permit Description: INSTALL 3 NEW SHADE STRUCTURES AS SHOWN IN DEVELOPMENT PLAN TD-DEV-00225-00052
Start Date Submittal Complete Date Status  
07/17/2025 COMMERCIAL REVIEW - LIMITED v.1 07/30/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0725-01368
Permit Status: Inspections complete
Permit Description: INSTALL 3 NEW SHADE STRUCTURES AS SHOWN IN DEVELOPMENT PLAN TD-DEV-00225-00052
Date Description Comments
07/17/2025 Permit address is 6601 S San Fernando Rd and address on Construction Plan is 2007 N Stone Av.
07/17/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0725-01368
Permite Description: INSTALL 3 NEW SHADE STRUCTURES AS SHOWN IN DEVELOPMENT PLAN TD-DEV-00225-00052
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/04/2025 COT - BULD - SWG Clearance N/A Not Applicable 9-4-25: not applicable.
08/25/2025 COT - LCBU - Excavation/Rebar/Zoning N/A Partial Pass 8-25-25: reinforcement/excavation on 3 canopy footers verified per plans. Okay to pour footers.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0725-01368
Permit Description: INSTALL 3 NEW SHADE STRUCTURES AS SHOWN IN DEVELOPMENT PLAN TD-DEV-00225-00052
Total Completed Inspections - 5
Date Description Inspector Results Comments
09/04/2025 COT - LCBU - Building Final Passed 9-4-25: building final approved on 3 metal shade structures.
09/04/2025 COT - LCBU - Excavation/Rebar/Zoning Passed 9-4-25: approved.
09/04/2025 ENGR Engineering Final Passed Shade structures are installed per plans.
09/04/2025 TRSP - ROW - Final/Close-Out Passed
09/04/2025 COT - LCBU - Framing Passed 9-4-25: approved.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CALCS_SAN MIGUEL HIGH SCHOOL_25.273_V1.PDF DOCUMENTS VIEW
CONS-APS_SAN MIGUELHS_PLANSET_V1.PDF DOCUMENTS VIEW