Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Address NEW:
108 S CHURCH AV BLDG 1
Apply Date:
07/15/2025
Applicant:
Eric Means
Description:
Repair Adobe Masonry 20 lineal feet inculdes foundation repair, 60 square feet interior plaster. No Elect, Plumbing, or Mecnanical. Includes tempro bracing within 4" of wall surface

Permit Reviews

Permit Number - TC-COM-0725-01362
Permit Status: Issued
Permit Description: Repair Adobe Masonry 20 lineal feet inculdes foundation repair, 60 square feet interior plaster. No Elect, Plumbing, or Mecnanical. Includes tempro bracing within 4" of wall surface
Start Date Submittal Complete Date Status  
09/03/2025 COMMERCIAL REVIEW - LIMITED v.3 09/12/2025 APPROVED Review Details
12/10/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/16/2025 APPROVED Review Details
07/17/2025 COMMERCIAL REVIEW - LIMITED v.1 08/07/2025 REQUIRES RESUBMIT Review Details
08/26/2025 COMMERCIAL REVIEW - LIMITED v.2 08/26/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0725-01362
Permit Status: Issued
Permit Description: Repair Adobe Masonry 20 lineal feet inculdes foundation repair, 60 square feet interior plaster. No Elect, Plumbing, or Mecnanical. Includes tempro bracing within 4" of wall surface
Date Description Comments
07/28/2025 SPECIAL INSPECTION OF MASONRY IS REQUIRED.
07/17/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0725-01362
Permit Description: Repair Adobe Masonry 20 lineal feet inculdes foundation repair, 60 square feet interior plaster. No Elect, Plumbing, or Mecnanical. Includes tempro bracing within 4" of wall surface
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/08/2025 COT - LCBU - Excavation/Rebar/Zoning Passed Ok to place concrete for the footings.
10/15/2025 COT - LCBU - Masonry Pregrout Passed Masonry double wall topped out; Ok to grout progress areas.
12/10/2025 COT - LCBU - Building Final Passed Passed 12/10/25
12/10/2025 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
3 108 S CHURCH ADOBE WALL REPAIR CALCS_V1.PDF DOCUMENTS VIEW
4 SPECIAL INSPECTION CERTIFICATE-2025-09-02_V1.PDF DOCUMENTS VIEW
CONS-2 CANO-LEE ADOBE REPAIR - COMBINED SET_V2.PDF DOCUMENTS VIEW
TC-COM-0725-01362 9-2-25.PDF DOCUMENTS VIEW
TC-COM-0725-01362 DES PROF REVIEW 8-6-25.PDF DOCUMENTS VIEW
TC-COM-0725-01362 STABLES WALL REPAIR 7-15-25.PDF DOCUMENTS VIEW