Permit Details

Status:
Complete
Type:
Commercial Building
Address:
2886 N 1ST AV
Address NEW:
2886 N 1ST AV
Apply Date:
07/01/2025
Applicant:
Erika Hernandez
Description:
White Box shell space, no CofO

Permit Reviews

Permit Number - TC-COM-0725-01287
Permit Status: Complete
Permit Description: White Box shell space, no CofO
Start Date Submittal Complete Date Status  
09/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/22/2025 APPROVED Review Details
09/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/25/2025 APPROVED Review Details
07/07/2025 COMMERCIAL REVIEW - LIMITED v.1 07/21/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0725-01287
Permit Status: Complete
Permit Description: White Box shell space, no CofO
Date Description Comments
09/22/2025 AIR BALANCING REPORT IS REQUIRED.
07/07/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
07/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0725-01287
Permite Description: White Box shell space, no CofO
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/30/2025 BULD - Electrical Clearance N/A Not Applicable
10/30/2025 COT - BULD - SWG Clearance N/A Not Applicable
11/13/2025 COT - LCPL - Rough Soil N/A Not Applicable
11/13/2025 COT - LCPL - Yard Water Line N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0725-01287
Permit Description: White Box shell space, no CofO
Total Completed Inspections - 11
Date Description Inspector Results Comments
08/25/2025 COT - LCEL - Electrical Intermediate Passed
08/25/2025 COT - LCPL - Plumbing Intermediate Passed
09/03/2025 COT - LCEL - Electrical Above Ceiling Passed
10/30/2025 COT - FCON - Fire - Final Passed
10/30/2025 COT - LCBU - Building Final Passed
10/30/2025 COT - LCEL - Electrical Final Passed
10/30/2025 COT - LCME - Mechanical Final Passed
10/30/2025 COT - LCPL - Plumbing Final Passed
10/30/2025 ENGR Engineering Final Passed Shell is complete. Site is safe.
11/07/2025 TRSP - ROW - Final/Close-Out Passed
10/30/2025 COT - LCEL - Grounding/Bonding Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
INNOVATIVE TECHNOLOGY - 2886 N. 1ST AVE. LAB RESULTS-2025-09-24_V1.PDF DOCUMENTS VIEW
2886 N 1ST HVAC BALANCE REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-2886 N. 1ST AVE. - CDS - 7 1 25_V1.PDF DOCUMENTS VIEW