Permit: TC-COM-0724-01416
Permit Details
Apply Date:
07/24/2024
Applicant:
Andrew Venne
Description:
Tenant Improvement
Permit Reviews
Permit Number - TC-COM-0724-01416
Permit Status: Approved
Permit Description: Tenant Improvement
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/19/2024 | RESTAMP - COMMERCIAL v.1 | N/A | IN REVIEW |
12/02/2024 | COMMERCIAL REVIEW - FULL v.3 | 12/19/2024 | APPROVED |
10/14/2024 | COMMERCIAL REVIEW - FULL v.2 | 10/29/2024 | REQUIRES RESUBMIT |
07/24/2024 | COMMERCIAL REVIEW - FULL v.1 | 09/18/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0724-01416
Permit Status: Approved
Permit Description: Tenant Improvement
Total Outstanding Activity Conditions - 9
Date | Name |
---|---|
07/24/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
12/02/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
12/06/2024 | AIR BALANCING REPORT IS REQUIRED. |
12/06/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
12/06/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
12/06/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
12/06/2024 | Post-Installed Anchor Inspection Report is required. |
12/06/2024 | SPECIAL INSPECTION FOR Structural Steel IS REQUIRED |
12/06/2024 | WATER STERILIZATION REPORT IS REQUIRED. |