Permit: TC-COM-0724-01379
Permit Details
Apply Date:
07/17/2024
Applicant:
Eduardo Ornelas
Description:
new apartment bldg 2 - 3 bedroom units (upstairs) 2 - 3 bedroom units (downstairs) 4 units total
Permit Reviews
Permit Number - TC-COM-0724-01379
Permit Status: Expired
Permit Description: new apartment bldg
2 - 3 bedroom units (upstairs)
2 - 3 bedroom units (downstairs)
4 units total
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/05/2024 | COMMERCIAL REVIEW - FULL v.2 | 10/07/2024 | REQUIRES RESUBMIT |
| 07/18/2024 | COMMERCIAL REVIEW - FULL v.1 | 08/19/2024 | REQUIRES RESUBMIT |
| 10/24/2024 | COMMERCIAL REVIEW - FULL v.3 | 12/04/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0724-01379
Permit Status: Expired
Permit Description: new apartment bldg
2 - 3 bedroom units (upstairs)
2 - 3 bedroom units (downstairs)
4 units total
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 07/18/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 |
| 07/18/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
| 07/18/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
| 11/04/2024 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
| 11/04/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
| 11/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 11/04/2024 | WATER STERILIZATION REPORT IS REQUIRED. |