Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
07/16/2024
Applicant:
Chelsey Wiese
Description:
Installation of 500 kWdc rooftop, Solar Array

Permit Reviews

Permit Number - TC-COM-0724-01373
Permit Status: Inspections
Permit Description: Installation of 500 kWdc rooftop, Solar Array
Start Date Submittal Complete Date Status  
07/17/2024 COMMERCIAL REVIEW - FULL v.1 08/19/2024 APPROVED Review Details

Conditions

Permit Number - TC-COM-0724-01373
Permit Status: Inspections
Permit Description: Installation of 500 kWdc rooftop, Solar Array
Date Description Comments
08/19/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0724-01373
Permite Description: Installation of 500 kWdc rooftop, Solar Array
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
01/23/2025 COT - CSOL - Electrical Underground Solar Project N/A Not Applicable no underground at project
02/10/2025 COT - LCEL - Electrical Final N/A Not Ready Pending line-side tap and final solar inspections
02/06/2025 BULD - Electrical Clearance N/A Not Ready Pending line-side tap and final solar inspections
02/11/2025 COT - CSOL - Electrical Final Solar Project N/A Partial Pass 2/6/25 - Pending line-side tap and final solar inspections
2/11/25: DGL line-side tap approved

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0724-01373
Permit Description: Installation of 500 kWdc rooftop, Solar Array
Total Completed Inspections - 8
Date Description Inspector Results Comments
01/23/2025 COT - CSOL - Electrical Progress Solar Project Passed hard conduit and boxes/ communication per spec, ok to proceed with wire and install
02/06/2025 COT - CSOL - Electrical Intermediate Solar Project Passed Approved intermediate solar inspections from 700A disconnect through the 7 inverters and roof panels
Pending line-side tap and final solar inspections
02/06/2025 COT - CSOL - Grounding/Bonding Solar Project Passed
02/10/2025 COT - FCON - Fire - Final Passed
02/10/2025 COT - LCBU - Building Final Passed Electrical conduits, boxes, solar arrays, converters, meter box, and disconnect is complete. Waiting for line tap parts to be delivered and installed so solar final can be completed.
02/10/2025 TRSP - ROW - Final/Close-Out Passed All work to install solar panels was done outside of right away therefore no damage to any city right away.
02/11/2025 BULD - Electrical Clearance Passed 2/6/25 - Pending line-side tap and final solar inspections
2/11/25: DGL line-side tap approved
02/12/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-20240710 - TUCSON, AZ T9478 - FINAL STRUCTURAL REPORT_V1.PDF DOCUMENTS VIEW