Apply Date:
07/16/2024
Applicant:
Chelsey Wiese
Description:
Installation of 500 kWdc rooftop, Solar Array
Permit Reviews
Permit Number - TC-COM-0724-01373
Permit Status: Inspections
Permit Description: Installation of 500 kWdc rooftop, Solar Array
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/17/2024 | COMMERCIAL REVIEW - FULL v.1 | 08/19/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0724-01373
Permit Status: Inspections
Permit Description: Installation of 500 kWdc rooftop, Solar Array
Date | Description | Comments |
---|---|---|
08/19/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0724-01373
Permite Description: Installation of 500 kWdc rooftop, Solar Array
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/23/2025 | COT - CSOL - Electrical Underground Solar Project | N/A | Not Applicable | no underground at project |
02/10/2025 | COT - LCEL - Electrical Final | N/A | Not Ready | Pending line-side tap and final solar inspections |
02/06/2025 | BULD - Electrical Clearance | N/A | Not Ready | Pending line-side tap and final solar inspections |
02/11/2025 | COT - CSOL - Electrical Final Solar Project | N/A | Partial Pass | 2/6/25 - Pending line-side tap and final solar inspections 2/11/25: DGL line-side tap approved |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0724-01373
Permit Description: Installation of 500 kWdc rooftop, Solar Array
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/23/2025 | COT - CSOL - Electrical Progress Solar Project | Passed | hard conduit and boxes/ communication per spec, ok to proceed with wire and install | |
02/06/2025 | COT - CSOL - Electrical Intermediate Solar Project | Passed | Approved intermediate solar inspections from 700A disconnect through the 7 inverters and roof panels Pending line-side tap and final solar inspections |
|
02/06/2025 | COT - CSOL - Grounding/Bonding Solar Project | Passed | ||
02/10/2025 | COT - FCON - Fire - Final | Passed | ||
02/10/2025 | COT - LCBU - Building Final | Passed | Electrical conduits, boxes, solar arrays, converters, meter box, and disconnect is complete. Waiting for line tap parts to be delivered and installed so solar final can be completed. | |
02/10/2025 | TRSP - ROW - Final/Close-Out | Passed | All work to install solar panels was done outside of right away therefore no damage to any city right away. | |
02/11/2025 | BULD - Electrical Clearance | Passed | 2/6/25 - Pending line-side tap and final solar inspections 2/11/25: DGL line-side tap approved |
|
02/12/2025 | ENGR Engineering Final | Passed |