Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0724-01359
Permit Details
Apply Date:
07/15/2024
Applicant:
Description:
Structural Repairs to 24 existing wood barrel vault roof trusses at the existing building due to signs of distress.
Permit Reviews
Permit Number - TC-COM-0724-01359
Permit Status: Complete
Permit Description: Structural Repairs to 24 existing wood barrel vault roof trusses at the existing building due to signs of distress.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/10/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/15/2025 | APPROVED |
| 07/15/2024 | COMMERCIAL REVIEW - FULL v.1 | 08/15/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0724-01359
Permit Status: Complete
Permit Description: Structural Repairs to 24 existing wood barrel vault roof trusses at the existing building due to signs of distress.
| Date | Description | Comments |
|---|---|---|
| 07/15/2024 | Please contact Pima County Addressing to verify official address. Addressing@pima.gov or 520-724-9512 | |
| 08/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 07/15/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/15/2024 | SPECIAL INSPECTION FOR WOOD TRUSS REPAIR IS REQUIRED | |
| 08/15/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0724-01359
Permit Description: Structural Repairs to 24 existing wood barrel vault roof trusses at the existing building due to signs of distress.
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/07/2025 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
| 04/01/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 04/02/2025 | BULD - Electrical Clearance | Passed | N/a 4/2/2025 | |
| 04/02/2025 | ENGR Engineering Final | Passed | ||
| 04/09/2025 | COT - LCBU - Building Final | Passed | Special inspection reports are uploaded and under review. 4/9/2025 | |
| 04/09/2025 | COT - LCBU - Framing | Passed | ||
| 04/09/2025 | COT - FCON - Fire - Final | Passed |