Permit: TC-COM-0724-01340
Permit Details
Status:
Inspections
Type:
Commercial Building
Address:
365 E SAHUARO ST BLDG 1
Address NEW:
365 E SAHUARO ST BLDG 1
Apply Date:
07/11/2024
Applicant:
Abraham Flores
Description:
BUILDING A - Apartment complex, made up of 3 buildings. Building A - 5 units Building B - 4 units Building C - 3Units 12 units in total.
Permit Reviews
Permit Number - TC-COM-0724-01340
Permit Status: Inspections
Permit Description: BUILDING A - Apartment complex, made up of 3 buildings.
Building A - 5 units
Building B - 4 units
Building C - 3Units
12 units in total.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/01/2025 | RESTAMP - COMMERCIAL v.1 | 04/03/2025 | APPROVED |
| 01/22/2026 | COMMERCIAL REVIEW - FULL v.1 | 01/27/2026 | REQUIRES RESUBMIT |
| 04/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/28/2025 | APPROVED |
| 08/22/2024 | COMMERCIAL REVIEW - FULL v.3 | 08/22/2024 | REQUIRES RESUBMIT |
| 12/23/2024 | COMMERCIAL REVIEW - FULL v.5 | 01/15/2025 | REQUIRES RESUBMIT |
| 07/30/2024 | COMMERCIAL REVIEW - FULL v.2 | 07/30/2024 | REQUIRES RESUBMIT |
| 02/14/2025 | COMMERCIAL REVIEW - FULL v.6 | 03/04/2025 | REQUIRES RESUBMIT |
| 05/12/2025 | RESTAMP - COMMERCIAL v.1 | 05/15/2025 | APPROVED |
| 07/11/2024 | COMMERCIAL REVIEW - FULL v.1 | 07/11/2024 | REQUIRES RESUBMIT |
| 08/27/2024 | COMMERCIAL REVIEW - FULL v.4 | 09/26/2024 | REQUIRES RESUBMIT |
| 03/06/2025 | COMMERCIAL REVIEW - FULL v.7 | 04/01/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0724-01340
Permit Status: Inspections
Permit Description: BUILDING A - Apartment complex, made up of 3 buildings.
Building A - 5 units
Building B - 4 units
Building C - 3Units
12 units in total.
Total Outstanding Activity Conditions - 10
| Date | Name |
|---|---|
| 02/17/2025 | AIR BALANCING REPORT IS REQUIRED. |
| 02/17/2025 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. |
| 02/17/2025 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
| 02/17/2025 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 02/17/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 02/17/2025 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 02/17/2025 | WATER STERILIZATION REPORT IS REQUIRED. |
| 02/17/2025 | SPECIAL INSPECTION FOR WELD REINF STEEL IS REQUIRED. |
| 02/17/2025 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
| 04/24/2025 | REVISED INTERMEDIATE SPECIAL INSPECTION CERTIFICATE |
Conditions
Permit Number - TC-COM-0724-01340
Permit Status: Inspections
Permit Description: BUILDING A - Apartment complex, made up of 3 buildings.
Building A - 5 units
Building B - 4 units
Building C - 3Units
12 units in total.
| Date | Description | Comments |
|---|---|---|
| 08/21/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 04/03/2025 | The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account. | |
| 08/21/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/21/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 02/17/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-COM-0724-01340
Permite Description: BUILDING A - Apartment complex, made up of 3 buildings.
Building A - 5 units
Building B - 4 units
Building C - 3Units
12 units in total.
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2025 | COT - HCBU - Exterior Clips/Sheathing | N/A | Not Ready | |
| 02/06/2026 | ENGR Engineering Final | N/A | Not Ready | They wanted an inspection for ROW sidewalk, informed them that they need a Right-of-Way permit for work being done along Sahuaro Street. Not ready for Engineering Final on this permit. |
| 02/09/2026 | COT - HCBU - Building Progress | N/A | Partial Pass | |
| 02/18/2026 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | |
| 04/28/2026 | COT - HCEL - Electrical Progress | N/A | Partial Pass | |
| 05/13/2026 | COT - HCPL - Yard Water Line | N/A | Partial Pass | 5/13/26: Main water line per approved plans, system under pressure and shading was present at time of inspection. Ok to proceed with backfill. Ensure additional backfill material is used to backfill trench |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-COM-0724-01340
Permit Description: BUILDING A - Apartment complex, made up of 3 buildings.
Building A - 5 units
Building B - 4 units
Building C - 3Units
12 units in total.
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Gustavo Armenta (06/03/2025): Contact: Roger (480)410-2381. Request for 11:00am inspection 6/4/25 stemwall ok for concrete |
|
| 07/29/2025 | COT - HCPL - Rough Soil | Passed | ||
| 08/11/2025 | COT - HCBU - Preslab | Passed | ||
| 03/06/2026 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 03/23/2026 | COT - HCPL - Sewer | Passed | ||
| 05/22/2026 | COT - HCBU - Framing | Passed | ||
| 05/22/2026 | COT - HCEL - Electrical Intermediate | Passed | ||
| 05/22/2026 | COT - HCME - Mechanical Intermediate | Passed |