Permit: TC-COM-0724-01337
Permit Details
Status:
Inspections Complete
Type:
Commercial Building
Address:
3906 N ORACLE RD BLDG 0 UNIT 110
Address NEW:
3906 N ORACLE RD BLDG 0 UNIT 110
Apply Date:
07/10/2024
Applicant:
Robert Page
Description:
New Drive Thru for Dispenaray
Permit Reviews
Permit Number - TC-COM-0724-01337
Permit Status: Inspections complete
Permit Description: New Drive Thru for Dispenaray
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/11/2024 | COMMERCIAL REVIEW - FULL v.1 | 08/12/2024 | REQUIRES RESUBMIT |
| 03/10/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/10/2025 | APPROVED |
| 12/02/2024 | COMMERCIAL REVIEW - FULL v.1 | 12/26/2024 | APPROVED |
| 08/13/2024 | COMMERCIAL REVIEW - FULL v.2 | 09/16/2024 | REQUIRES RESUBMIT |
| 10/23/2024 | RESTAMP - COMMERCIAL v.1 | 10/28/2024 | APPROVED |
| 09/18/2024 | COMMERCIAL REVIEW - FULL v.3 | 10/18/2024 | REQUIRES RESUBMIT |
| 10/21/2024 | COMMERCIAL REVIEW - FULL v.4 | 10/23/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0724-01337
Permit Status: Inspections complete
Permit Description: New Drive Thru for Dispenaray
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 10/22/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 10/22/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 10/22/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 10/22/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
| 10/22/2024 | Masonry Inspection Report submittal review is required. |
| 10/22/2024 | Post-Installed Anchor Inspection Report is required. |
| 10/22/2024 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
| 10/22/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-COM-0724-01337
Permit Status: Inspections complete
Permit Description: New Drive Thru for Dispenaray
| Date | Description | Comments |
|---|---|---|
| 07/11/2024 | Please contact Pima County Addressing to verify official address. Addressing@pima.gov or 520-724-9512 | |
| 10/22/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 07/11/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0724-01337
Permite Description: New Drive Thru for Dispenaray
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/02/2024 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | |
| 01/14/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 20' inside from West end. |
| 01/14/2025 | COT - HCBU - Preslab | N/A | Not Ready | builder confused about label |
| 11/22/2024 | COT - HCBU - Framing | N/A | Partial Pass | |
| 04/07/2025 | ENGR Engineering Final | N/A | Partial Pass | Contractor needs to clean up in the back area. Contractor also needs to address the downspouts in the back of the building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-COM-0724-01337
Permit Description: New Drive Thru for Dispenaray
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 02/28/2025 | COT - HCBU - Building Above Ceiling | Passed | 2-28-25, verified master coolers installed. | |
| 02/28/2025 | COT - HCME - Mechanical Intermediate | Passed | 2-28-25, mechanical intermediate approved. | |
| 02/28/2025 | COT - HCME - Mechanical Above Ceiling | Passed | 2-28-25, mechanical above ceiling approved. | |
| 03/07/2025 | COT - HCBU - Masonry Pregrout | Passed | ||
| 03/21/2025 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Drive-thru entry area. Ok to place concrete in progress areas. | |
| 03/21/2025 | COT - HCBU - Preslab | Passed | Drive-thru entry area. Ok to place concrete in progress areas. | |
| 03/25/2025 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 03/25/2025 | COT - HCBU - Framing | Passed | ||
| 03/25/2025 | COT - HCEL - Electrical Above Ceiling | Passed | 3-5-25, approved. | |
| 03/25/2025 | COT - HCPL - Plumbing Above Ceiling | Passed | 3-5-25, approved. | |
| 03/25/2025 | COT - HCPL - Rough Soil | Passed | ||
| 04/02/2025 | COT - HCME - Mechanical Final | Passed | ||
| 04/02/2025 | COT - HCPL - Plumbing Final | Passed | ||
| 04/02/2025 | COT - HCEL - Electrical Final | Passed | ||
| 04/03/2025 | COT - FCON - Sprinkler - Final | Passed | ||
| 04/03/2025 | COT - FCON - Fire - Final | Passed | ||
| 04/07/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 04/07/2025 | COT - HCBU - Building Final | Passed | ||
| 04/14/2025 | ENGR Engineering Final | Passed |