Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Apply Date:
07/10/2024
Applicant:
Robert Page
Description:
New Drive Thru for Dispenaray

Permit Reviews

Permit Number - TC-COM-0724-01337
Permit Status: Inspections complete
Permit Description: New Drive Thru for Dispenaray
Start Date Submittal Complete Date Status  
07/11/2024 COMMERCIAL REVIEW - FULL v.1 08/12/2024 REQUIRES RESUBMIT Review Details
03/10/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/10/2025 APPROVED Review Details
12/02/2024 COMMERCIAL REVIEW - FULL v.1 12/26/2024 APPROVED Review Details
08/13/2024 COMMERCIAL REVIEW - FULL v.2 09/16/2024 REQUIRES RESUBMIT Review Details
10/23/2024 RESTAMP - COMMERCIAL v.1 10/28/2024 APPROVED Review Details
09/18/2024 COMMERCIAL REVIEW - FULL v.3 10/18/2024 REQUIRES RESUBMIT Review Details
10/21/2024 COMMERCIAL REVIEW - FULL v.4 10/23/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0724-01337
Permit Status: Inspections complete
Permit Description: New Drive Thru for Dispenaray
Total Outstanding Activity Conditions - 8
Date Name
10/22/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/22/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/22/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
10/22/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
10/22/2024 Masonry Inspection Report submittal review is required.
10/22/2024 Post-Installed Anchor Inspection Report is required.
10/22/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
10/22/2024 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0724-01337
Permit Status: Inspections complete
Permit Description: New Drive Thru for Dispenaray
Date Description Comments
07/11/2024 Please contact Pima County Addressing to verify official address. Addressing@pima.gov or 520-724-9512
10/22/2024 AIR BALANCING REPORT IS REQUIRED.
07/11/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0724-01337
Permite Description: New Drive Thru for Dispenaray
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
12/02/2024 COT - HCBU - Masonry Pregrout N/A Partial Pass
01/14/2025 COT - HCBU - Excavation/Rebar/Zoning N/A Partial Pass 20' inside from West end.
01/14/2025 COT - HCBU - Preslab N/A Not Ready builder confused about label
11/22/2024 COT - HCBU - Framing N/A Partial Pass
04/07/2025 ENGR Engineering Final N/A Partial Pass Contractor needs to clean up in the back area. Contractor also needs to address the downspouts in the back of the building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0724-01337
Permit Description: New Drive Thru for Dispenaray
Total Completed Inspections - 20
Date Description Inspector Results Comments
12/17/2024 COT - HCEL - Electrical Intermediate Passed
02/28/2025 COT - HCBU - Building Above Ceiling Passed 2-28-25, verified master coolers installed.
02/28/2025 COT - HCME - Mechanical Intermediate Passed 2-28-25, mechanical intermediate approved.
02/28/2025 COT - HCME - Mechanical Above Ceiling Passed 2-28-25, mechanical above ceiling approved.
03/07/2025 COT - HCBU - Masonry Pregrout Passed
03/21/2025 COT - HCBU - Excavation/Rebar/Zoning Passed Drive-thru entry area. Ok to place concrete in progress areas.
03/21/2025 COT - HCBU - Preslab Passed Drive-thru entry area. Ok to place concrete in progress areas.
03/25/2025 COT - HCPL - Plumbing Intermediate Passed
03/25/2025 COT - HCBU - Framing Passed
03/25/2025 COT - HCEL - Electrical Above Ceiling Passed 3-5-25, approved.
03/25/2025 COT - HCPL - Plumbing Above Ceiling Passed 3-5-25, approved.
03/25/2025 COT - HCPL - Rough Soil Passed
04/02/2025 COT - HCME - Mechanical Final Passed
04/02/2025 COT - HCPL - Plumbing Final Passed
04/02/2025 COT - HCEL - Electrical Final Passed
04/03/2025 COT - FCON - Sprinkler - Final Passed
04/03/2025 COT - FCON - Fire - Final Passed
04/07/2025 TRSP - ROW - Final/Close-Out Passed
04/07/2025 COT - HCBU - Building Final Passed
04/14/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
D2 DRIVE THRU TEST AND BALANCE REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-5_DRAWINGS REVISION_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_SPECIAL INSPECTION-2024-08-13_V1.PDF DOCUMENTS VIEW
4_CALC_V1.PDF DOCUMENTS VIEW
CONS-4_DRAWINGS_V1_V1.PDF DOCUMENTS VIEW
2_SPECIAL INSPECTION-2024-08-13_V1-2024-10-23_V1.PDF DOCUMENTS VIEW
4_CALC_V1_V1.PDF DOCUMENTS VIEW