Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
07/27/2023
Applicant:
Dean Bagley
Description:
Unit 7C Installation of a new gas line for the stove, furnace, and water heater from the gas meter. The plan is to install a new 1” black still gas pipe from the gas meter, onto the roof and down into the wall and to the fixture.

Permit Reviews

Permit Number - TC-COM-0723-01830
Permit Status: Issued
Permit Description: Unit 7C Installation of a new gas line for the stove, furnace, and water heater from the gas meter. The plan is to install a new 1” black still gas pipe from the gas meter, onto the roof and down into the wall and to the fixture.
Start Date Submittal Complete Date Status  
07/27/2023 COMMERCIAL PDSD SIMPLE REVIEW v.1 07/27/2023 REQUIRES RESUBMIT Review Details
07/28/2023 COMMERCIAL PDSD SIMPLE REVIEW v.2 08/03/2023 APPROVED Review Details

Conditions

Permit Number - TC-COM-0723-01830
Permit Status: Issued
Permit Description: Unit 7C Installation of a new gas line for the stove, furnace, and water heater from the gas meter. The plan is to install a new 1” black still gas pipe from the gas meter, onto the roof and down into the wall and to the fixture.
Date Description Comments
08/03/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0723-01830
Permit Description: Unit 7C Installation of a new gas line for the stove, furnace, and water heater from the gas meter. The plan is to install a new 1” black still gas pipe from the gas meter, onto the roof and down into the wall and to the fixture.
Total Completed Inspections - 3
Date Description Inspector Results Comments
08/09/2023 COT - LCPL - Gas Pressure Test Passed
08/09/2023 COT - LCPL - Plumbing Final Passed
08/09/2023 COT - BULD - SWG Clearance Passed Approved gas piping and pressure test, SWG Clearance is required for the reconnect of unit C