Permit: TC-COM-0723-01804
Permit Details
Apply Date:
07/24/2023
Applicant:
Charles Rakestraw
Description:
Construction and Facilitating of new Retail AutoZone
Permit Reviews
Permit Number - TC-COM-0723-01804
Permit Status: Complete
Permit Description: Construction and Facilitating of new Retail AutoZone
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/27/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/27/2023 | APPROVED |
10/11/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/26/2023 | REQUIRES RESUBMIT |
06/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 06/18/2024 | REQUIRES RESUBMIT |
06/07/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 06/07/2024 | REQUIRES RESUBMIT |
09/18/2023 | COMMERCIAL REVIEW - FULL v.2 | 10/02/2023 | APPROVED |
07/25/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/29/2023 | REQUIRES RESUBMIT |
11/28/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/30/2023 | APPROVED |
09/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/19/2024 | APPROVED |
06/04/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/06/2024 | REQUIRES RESUBMIT |
08/21/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.4 | 08/21/2024 | APPROVED |
12/01/2023 | RESTAMP - COMMERCIAL v.1 | 12/05/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0723-01804
Permit Status: Complete
Permit Description: Construction and Facilitating of new Retail AutoZone
Date | Description | Comments |
---|---|---|
07/25/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
04/11/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
09/18/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
10/11/2023 | Prior to Issuance: This project requires issuance of a Development Package (DP) permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit. | |
04/11/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/11/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
04/11/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
04/11/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
04/11/2024 | ||
04/11/2024 | Masonry Inspection Report submittal review is required. | |
11/28/2023 | Storage Racking System Designs must be submitted and approved prior to final. | |
07/28/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/11/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
04/11/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0723-01804
Permite Description: Construction and Facilitating of new Retail AutoZone
Total Outstanding Inspections - 12
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/02/2024 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | ok for first lift |
12/11/2023 | COT - HCPL - Rough Soil | N/A | Not Ready | 12/11/23: Pre-con meeting wanted. |
12/18/2023 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 12/18/23 Under slab in building footprint |
02/12/2024 | COT - HCEL - Electrical Above Ceiling | N/A | Partial Pass | 12/18/23 Under slab in building footprint 2/12/24: electrical rough-in in walls per plan ok to proceed. Electrical above ceiling rough in per plan. |
02/12/2024 | COT - HCBU - Framing | N/A | Partial Pass | Roof framing only 2/12/24: rough framing inspection for interior walls, soffits, ceilings and exterior canopy framing at store entrance. Passed. |
01/18/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | |
04/17/2024 | COT - HCBU - Building Progress | N/A | Not Ready | |
12/18/2023 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 12/18/23 Under slab in building footprint |
03/13/2024 | ENGR Engineering Final | N/A | Not Ready | Viewed footer for monument sign at NE entry all #5 vertical and horizontal rebar is present, grading continues thru out site and viewed (3) water harvest islands in East parking lot area and (2) large basin areas located at rear SE and front North of site are in landscape rough irrigation process. Robert will contact Ernie Stevens regarding all needed site inspections that are needed for Robert to call in. |
12/18/2023 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 12/18/23 under slab at footing and only to exterior of footings |
06/04/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | Ok for Level 4 TCO. Awaiting exterior address numbers. |
05/23/2024 | COT - HCBU - TCO | N/A | Not Ready | 5/23/24: not ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0723-01804
Permit Description: Construction and Facilitating of new Retail AutoZone
Total Completed Inspections - 31