Permit Details

Status:
Needs Resubmittal
Type:
Commercial Building
Apply Date:
07/17/2023
Applicant:
Lisa Bowers
Description:
New Commercial Shell Building

Permit Reviews

Permit Number - TC-COM-0723-01724
Permit Status: Needs resubmittal
Permit Description: New Commercial Shell Building
Start Date Submittal Complete Date Status  
09/27/2023 COMMERCIAL REVIEW - FULL v.2 10/26/2023 REQUIRES RESUBMIT Review Details
07/18/2023 COMMERCIAL REVIEW - FULL v.1 08/21/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0723-01724
Permit Status: Needs resubmittal
Permit Description: New Commercial Shell Building
Total Outstanding Activity Conditions - 16
Date Name
07/24/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
07/24/2023 Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents.
07/24/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
07/24/2023 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
07/24/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/24/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
07/24/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/24/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
07/24/2023 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
07/24/2023 SPECIAL INSPECTION FOR OUTDOOR LIGHTING IS REQUIRED.
07/24/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/24/2023 Post-Tension Inspection Report is required.
07/24/2023 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
07/24/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
07/24/2023 WATER STERILIZATION REPORT IS REQUIRED.
07/24/2023 SPECIAL INSPECTION FOR WELDING IS REQUIRED.