Permit: TC-COM-0723-01712
Permit Details
Apply Date:
07/14/2023
Applicant:
Jocelyn Manor
Description:
Tenant Improvement of an existing building to turn to a new Dollar Tree Store. Scope of work includes, Architectural, Structural, MEP, Fire Protection and Refrigeration Drawings for reference. Install new fixtures and checkouts per drawings, tenant finishes, and freezer / cooler.
Permit Reviews
Permit Number - TC-COM-0723-01712
Permit Status: Complete
Permit Description: Tenant Improvement of an existing building to turn to a new Dollar Tree Store. Scope of work includes, Architectural, Structural, MEP, Fire Protection and Refrigeration Drawings for reference. Install new fixtures and checkouts per drawings, tenant finishes, and freezer / cooler.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/06/2024 | APPROVED |
02/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/14/2024 | APPROVED |
07/17/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/17/2023 | APPROVED |
11/24/2023 | COMMERCIAL REVIEW - FULL v.1 | 12/19/2023 | APPROVED |
01/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/22/2024 | APPROVED |
01/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/29/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0723-01712
Permit Status: Complete
Permit Description: Tenant Improvement of an existing building to turn to a new Dollar Tree Store. Scope of work includes, Architectural, Structural, MEP, Fire Protection and Refrigeration Drawings for reference. Install new fixtures and checkouts per drawings, tenant finishes, and freezer / cooler.
Date | Description | Comments |
---|---|---|
07/21/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
07/21/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
07/21/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
07/21/2023 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
07/21/2023 | WATER STERILIZATION REPORT IS REQUIRED. | |
07/21/2023 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0723-01712
Permite Description: Tenant Improvement of an existing building to turn to a new Dollar Tree Store. Scope of work includes, Architectural, Structural, MEP, Fire Protection and Refrigeration Drawings for reference. Install new fixtures and checkouts per drawings, tenant finishes, and freezer / cooler.
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/23/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
01/23/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
01/23/2024 | COT - HCEL - Grounding/Bonding | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0723-01712
Permit Description: Tenant Improvement of an existing building to turn to a new Dollar Tree Store. Scope of work includes, Architectural, Structural, MEP, Fire Protection and Refrigeration Drawings for reference. Install new fixtures and checkouts per drawings, tenant finishes, and freezer / cooler.
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/21/2023 | COT - HCPL - Plumbing Progress | Passed | UG only. | |
11/30/2023 | COT - HCBU - Framing | Passed | ||
01/08/2024 | COT - HCBU - Masonry Pregrout | Passed | ||
01/11/2024 | COT - FCON - Sprinkler - Final | Passed | ||
01/16/2024 | COT - FCON - Alarm - Final | Passed | no fire alarm work done. | |
01/16/2024 | COT - FCON - Fire - Final | Passed | ||
01/18/2024 | ENGR Engineering Final | Passed | ||
01/18/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
01/23/2024 | COT - HCBU - Building Final | Passed | ||
01/23/2024 | COT - HCBU - Building Progress | Passed | ||
01/23/2024 | COT - HCBU - CofO | Passed | ||
01/23/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
01/23/2024 | COT - HCEL - Electrical Progress | Passed | ||
01/23/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
01/23/2024 | COT - HCME - Mechanical Final | Passed | ||
01/23/2024 | COT - HCME - Mechanical Progress | Passed | ||
01/23/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
01/23/2024 | COT - HCPL - Plumbing Final | Passed | ||
01/23/2024 | COT - HCPL - Sewer | Passed |