Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Commercial Building
Address NEW:
405 W SPEEDWAY BL
Apply Date:
07/11/2023
Applicant:
Kyle Vilaubi
Description:
TI: Food Mart

Permit Reviews

Permit Number - TC-COM-0723-01679
Permit Status: Complete
Permit Description: TI: Food Mart
Start Date Submittal Complete Date Status  
05/21/2024 COMMERCIAL REVIEW - FULL v.3 05/21/2024 APPROVED Review Details
05/01/2024 COMMERCIAL REVIEW - FULL v.2 05/02/2024 REQUIRES RESUBMIT Review Details
07/11/2023 COMMERCIAL REVIEW - FULL v.1 08/08/2023 REQUIRES RESUBMIT Review Details
03/26/2025 COMMERCIAL REVIEW - FULL v.1 03/27/2025 APPROVED Review Details
07/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/29/2025 APPROVED Review Details
07/30/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/01/2025 APPROVED Review Details
10/31/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/06/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0723-01679
Permit Status: Complete
Permit Description: TI: Food Mart
Date Description Comments
05/23/2024 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
05/21/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
05/23/2024 COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED.
05/23/2024 Please submit a separate sign permit for an signs associated with this projet.
05/23/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0723-01679
Permite Description: TI: Food Mart
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/30/2024 COT - HCBU - Framing N/A Partial Pass 10/30/24: partial for exterior clip and nail. 3"x3" washer required at anchor bolts at shearwalls.
09/27/2024 COT - HCEL - Electrical Progress N/A Partial Pass Conduit lines for building and canopy area at 1” - 4”. Ok to cover progress areas.
10/13/2025 COT - HCBU - Sustainability N/A Not Applicable
10/13/2025 COT - HCBU - Interior Shear Bracing N/A Not Applicable
05/08/2025 COT - HCBU - Building Progress N/A Partial Pass Interior sheet rock nailing in main building. Ok to tape throughout.
10/13/2025 COT - BULD - SWG Clearance N/A Not Applicable
10/13/2025 BULD - Electrical Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0723-01679
Permit Description: TI: Food Mart
Total Completed Inspections - 23
Date Description Inspector Results Comments
09/18/2024 COT - HCPL - Rough Soil Passed approved for underslab ok to cover
04/30/2025 COT - HCBU - Framing Passed
05/28/2025 COT - HCPL - Sewer Passed Sewer line (4”) connected to 12” main sewer line in street. Ok to cover progress areas.
06/26/2025 COT - HCBU - Building Above Ceiling Passed
06/26/2025 COT - HCEL - Electrical Above Ceiling Passed
06/26/2025 COT - HCME - Mechanical Above Ceiling Passed
06/26/2025 COT - HCPL - Plumbing Progress Passed
09/29/2025 COT - FCON - Fire - Final Passed
10/06/2025 TRSP - ROW - Final/Close-Out Passed
11/03/2025 PDSD Heavy Commercial Building Division Pre-Construction Meeting Passed
10/13/2025 COT - HCME - Venting Passed
10/13/2025 COT - HCME - Mechanical Progress Passed
10/13/2025 COT - HCEL - Outdoor Lighting Passed
10/13/2025 COT - HCEL - Grounding/Bonding Passed
10/13/2025 COT - HCEL - Electrical Progress Passed
10/13/2025 COT - HCBU - Roof Nailing Passed
10/13/2025 COT - HCBU - Building Progress Passed
10/23/2025 ENGR Engineering Final Passed
11/03/2025 COT - HCME - Mechanical Final Passed
11/03/2025 COT - HCPL - Plumbing Final Passed
11/03/2025 COT - HCEL - Electrical Final Passed
11/05/2025 COT - HCBU - Building Final Passed
11/05/2025 COT - HCBU - CofO Passed