Permit: TC-COM-0723-01678
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
405 W SPEEDWAY BL
Address NEW:
405 W SPEEDWAY BL
Apply Date:
07/11/2023
Applicant:
Nico Fricchione
Description:
New Shell Building for Future Food Mart and Fuel Station
Permit Reviews
Permit Number - TC-COM-0723-01678
Permit Status: Complete
Permit Description: New Shell Building for Future Food Mart and Fuel Station
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/18/2024 | APPROVED |
| 10/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/30/2025 | APPROVED |
| 09/26/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/30/2025 | APPROVED |
| 05/01/2024 | COMMERCIAL REVIEW - FULL v.2 | 05/02/2024 | REQUIRES RESUBMIT |
| 07/11/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/08/2023 | REQUIRES RESUBMIT |
| 07/30/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/01/2025 | APPROVED |
| 05/20/2024 | RESTAMP - COMMERCIAL v.1 | 05/22/2024 | APPROVED |
| 05/15/2024 | COMMERCIAL REVIEW - FULL v.3 | 05/20/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0723-01678
Permit Status: Complete
Permit Description: New Shell Building for Future Food Mart and Fuel Station
| Date | Description | Comments |
|---|---|---|
| 05/23/2024 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. | |
| 05/23/2024 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
| 05/23/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 05/22/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 05/23/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/23/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 05/23/2024 | Please submit a separate sign permit for an signs associated with this projet. | |
| 05/23/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 05/23/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 09/09/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 05/23/2024 | WATER STERILIZATION REPORT IS REQUIRED. | |
| 05/23/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. | |
| 05/23/2024 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0723-01678
Permite Description: New Shell Building for Future Food Mart and Fuel Station
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2025 | COT - HCPL - Plumbing Final | N/A | Partial Pass | This inspection is for Plumbing Intermediate; in wall,plumbing. Ok to insulate and cover walls. |
| 05/30/2025 | COT - HCBU - Building Progress | N/A | Partial Pass | Domestic water line (1”) from meter to building on East side, Ok to cover progress area. |
| 10/13/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 10/30/2024 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 10/30/24: partial for exterior clip and nail. 3"x3" washer required at anchor bolts at shearwalls. |
| 10/30/2024 | COT - HCBU - Framing | N/A | Partial Pass | 10/30/24: partial for exterior clip and nail. 3"x3" washer required at anchor bolts at shearwalls. |
| 10/30/2024 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | |
| 08/27/2025 | COT - HCEL - Electrical Progress | N/A | Partial Pass | |
| 01/06/2025 | COT - HCME - Mechanical Progress | N/A | Partial Pass | Need to complete in wall mechanical and duct system for main store area. |
| 01/13/2025 | COT - HCME - Venting | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0723-01678
Permit Description: New Shell Building for Future Food Mart and Fuel Station
Total Completed Inspections - 23
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2024 | COT - HCPL - Rough Soil | Passed | ||
| 10/15/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Ok to place concrete in footings and slab area. | |
| 10/15/2024 | COT - HCBU - Preslab | Passed | Slab is reinforced with #4 wire mesh and has been termite treated. | |
| 10/15/2024 | COT - HCEL - Grounding/Bonding | Passed | Ufer is in place. | |
| 10/30/2024 | COT - HCBU - Roof Nailing | Passed | ||
| 01/13/2025 | COT - HCPL - Plumbing Progress | Passed | ||
| 03/04/2025 | COT - HCPL - Sewer | Passed | Grease interceptor connected to main sewer line (750 gallon capacity) | |
| 04/02/2025 | COT - HCEL - Electrical Underground | Passed | ||
| 05/28/2025 | COT - HCPL - Plumbing Final | Passed | Sewer to street connection complete | |
| 07/14/2025 | BULD - Electrical Clearance | Passed | ||
| 09/09/2025 | COT - HCBU - Building Progress | Passed | Light pole bases are in place. Concrete has been placed at this inspection. | |
| 09/29/2025 | COT - FCON - Fire - Final | Passed | ||
| 10/13/2025 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 10/13/2025 | COT - HCBU - Framing | Passed | ||
| 10/13/2025 | COT - HCEL - Electrical Progress | Passed | ||
| 10/13/2025 | COT - HCEL - Outdoor Lighting | Passed | ||
| 10/13/2025 | COT - HCME - Mechanical Progress | Passed | ||
| 10/13/2025 | COT - HCME - Venting | Passed | ||
| 10/23/2025 | ENGR Engineering Final | Passed | ||
| 10/24/2025 | TRSP - ROW - Final/Close-Out | Passed | ||
| 11/03/2025 | COT - HCME - Mechanical Final | Passed | ||
| 11/03/2025 | COT - HCEL - Electrical Final | Passed | ||
| 11/05/2025 | COT - HCBU - Building Final | Passed |