Permit: TC-COM-0723-01672
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
2601 E SPEEDWAY BL
Address NEW:
2601 E SPEEDWAY BL
Apply Date:
07/10/2023
Applicant:
Anthony Capps
Description:
New drive through restaurant shell building
Permit Reviews
Permit Number - TC-COM-0723-01672
Permit Status: Complete
Permit Description: New drive through restaurant shell building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/25/2024 | APPROVED |
| 07/10/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/08/2023 | APPROVED |
| 01/09/2024 | COMMERCIAL REVIEW - FULL v.1 | 02/07/2024 | REQUIRES RESUBMIT |
| 09/05/2023 | COMMERCIAL REVIEW - FULL v.1 | 09/05/2023 | REQUIRES RESUBMIT |
| 07/09/2024 | COMMERCIAL REVIEW - FULL v.2 | 07/09/2024 | APPROVED |
| 09/26/2023 | COMMERCIAL REVIEW - FULL v.1 | 10/25/2023 | APPROVED |
| 10/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/24/2024 | APPROVED |
Conditions
Permit Number - TC-COM-0723-01672
Permit Status: Complete
Permit Description: New drive through restaurant shell building
| Date | Description | Comments |
|---|---|---|
| 07/09/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 08/08/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 07/09/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 07/09/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
| 07/09/2024 | Steel Canopies Designs must be submitted and approved prior to final. | |
| 07/09/2024 | Please submit a separate sign permit for an signs associated with this projet. | |
| 07/09/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 07/09/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 07/09/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. | |
| 07/09/2024 | SPECIAL INSPECTION FOR WOOD FRAMED DIAPHRAGMS AND SHEAR WALLS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0723-01672
Permite Description: New drive through restaurant shell building
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| PDSD Heavy Commercial Building Division Pre-Construction Meeting | N/A | Requested | ||
| 11/06/2023 | COT - HCPL - Rough Soil | N/A | Canceled | |
| 11/14/2023 | COT - HCEL - Electrical Underground | N/A | Partial Pass | 11/14/23 partial for under slab only |
| 12/12/2023 | COT - HCBU - Exterior Clips/Sheathing | N/A | Partial Pass | Partial pass. Pending pop outs and parapets. 12/12/2023 |
| 12/12/2023 | COT - HCBU - Framing | N/A | Partial Pass | Partial pass. Pending intermediate. Pending pop outs and parapets. 12/12/2023 |
| 02/02/2024 | COT - HCBU - Interior Shear Bracing | N/A | Not Applicable | Not applicable for this phase of construction. |
| 02/02/2024 | COT - HCBU - Sustainability | N/A | Not Applicable | Not applicable for this project. Not a LEED Certified project. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0723-01672
Permit Description: New drive through restaurant shell building
Total Completed Inspections - 27
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2023 | COT - HCPL - Rough Soil | Passed | ||
| 11/14/2023 | COT - HCBU - Preslab | Passed | ||
| 12/04/2023 | COT - HCPL - Yard Water Line | Passed | Okay to backfill. Shading is required. 12/4/2023 | |
| 12/13/2023 | COT - HCBU - Roof Nailing | Passed | ||
| 02/02/2024 | COT - HCEL - Electrical Underground | Passed | 2/2/24: 2 each 4" underground conduits are in place for TEP to run power to the service entrance section on outside of building. | |
| 02/02/2024 | COT - HCBU - Exterior Clips/Sheathing | Passed | 2/2/24: Passed. Pop-outs and parapet walls are completed. | |
| 02/02/2024 | COT - HCBU - Framing | Passed | 2/2/24: Passed. Pop-outs and parapet walls are completed. | |
| 02/02/2024 | COT - HCBU - Building Progress | Passed | Shell building is framed and prepped for stucco finish. Interior mechanical, plumbing, and electrical rough-in for shell is completed. Okay to proceed with installation of insulation and drywall on exterior walls. | |
| 02/02/2024 | COT - HCEL - Electrical Progress | Passed | Shell building is framed and prepped for stucco finish. Interior mechanical, plumbing, and electrical rough-in for shell is completed. Okay to proceed with installation of insulation and drywall on exterior walls. | |
| 02/02/2024 | COT - HCME - Mechanical Progress | Passed | Shell building is framed and prepped for stucco finish. Interior mechanical, plumbing, and electrical rough-in for shell is completed. Okay to proceed with installation of insulation and drywall on exterior walls. | |
| 02/02/2024 | COT - HCPL - Plumbing Intermediate | Passed | Plumbing rough-in is complete for shell building. | |
| 02/02/2024 | COT - HCPL - Gas Pressure Test | Passed | Gasline is installed and holding 15#of air pressure. | |
| 02/02/2024 | COT - HCME - Venting | Passed | Ductwork is installed through roof for bathroom exhaust fans and kitchen exhaust fans. | |
| 04/25/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 04/25/2024 | COT - HCEL - Grounding/Bonding | Passed | ||
| 05/24/2024 | COT - HCEL - Outdoor Lighting | Passed | ||
| 05/24/2024 | COT - HCPL - Plumbing Final | Passed | ||
| 05/24/2024 | COT - HCEL - Electrical Final | Passed | ||
| 05/24/2024 | COT - HCME - Mechanical Final | Passed | ||
| 05/24/2024 | COT - BULD - SWG Clearance | Passed | Ok to set commercial gas meter | |
| 05/24/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
| 05/24/2024 | COT - HCPL - Sewer | Passed | ||
| 05/24/2024 | COT - HCBU - Building Final | Passed | Building shell is complete. | |
| 06/26/2024 | COT - FCON - Fire - Final | Passed | ||
| 06/26/2024 | ENGR Engineering Final | Passed | ||
| 06/26/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
| 06/26/2024 | COT - HCPL - Gas Final | Passed |