Permit: TC-COM-0723-01634
Permit Details
Status:
Issued
Type:
Commercial Building
Address:
10 W FORT LOWELL RD
Address NEW:
10 W FORT LOWELL RD
Apply Date:
07/05/2023
Applicant:
Denny Hawkins
Description:
This job will disconnect electric to turbines in sumps. 3 sump pumps. The conduit will be cut back and wire rolled up metal sump will be taken out and replaced with new fiberglass sump. Conduit will be redone with explosion fitting including new seal off at each location. Wires will be reinstalled. Like for like no new circuits or loads.
Permit Reviews
Permit Number - TC-COM-0723-01634
Permit Status: Issued
Permit Description: This job will disconnect electric to turbines in sumps. 3 sump pumps.
The conduit will be cut back and wire rolled up metal sump will be taken out and replaced with new fiberglass sump. Conduit will be redone with explosion fitting including new seal off at each location. Wires will be reinstalled. Like for like no new circuits or loads.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/05/2023 | COMMERCIAL PDSD SIMPLE REVIEW v.1 | 07/10/2023 | APPROVED |
Completed Inspections
Permit Status: Issued
Permit Number: TC-COM-0723-01634
Permit Description: This job will disconnect electric to turbines in sumps. 3 sump pumps.
The conduit will be cut back and wire rolled up metal sump will be taken out and replaced with new fiberglass sump. Conduit will be redone with explosion fitting including new seal off at each location. Wires will be reinstalled. Like for like no new circuits or loads.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2023 | COT - LCEL - Electrical Underground | Passed | New sumps have been installed, tested and approved by the State. Underground conduit is properly wrapped, fittings are being prepared to make them explosion proof. Okay to backfill tank area and pour back concrete slab. | |
| 10/04/2023 | COT - LCEL - Grounding/Bonding | Passed | ||
| 10/04/2023 | COT - LCEL - Electrical Intermediate | Passed | Approved for final inspection also. 10/4/2023 |