Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
06/23/2026
Applicant:
Andrew Venne
Description:
Tenant Improvement

Permit Reviews

Permit Number - TC-COM-0626-00948
Permit Status: Inspections
Permit Description: Tenant Improvement
Start Date Submittal Complete Date Status  
06/25/2026 COMMERCIAL REVIEW - LIMITED v.1 07/15/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0626-00948
Permit Status: Inspections
Permit Description: Tenant Improvement
Total Outstanding Activity Conditions - 2
Date Name
07/10/2026 AIR BALANCING REPORT IS REQUIRED.
07/10/2026 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-COM-0626-00948
Permit Status: Inspections
Permit Description: Tenant Improvement
Date Description Comments
06/25/2026 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
06/25/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0626-00948
Permite Description: Tenant Improvement
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
COT - LCEL - Electrical Intermediate N/A Scheduled
COT - LCPL - Plumbing Intermediate N/A Scheduled
COT - LCBU - Framing N/A Scheduled

Scheduled Inspections

Scheduled Inspections - TC-COM-0626-00948
Status: Inspections
Description: Tenant Improvement
Scheduled Date Description Entered By Entered Date
09/02/2026 COT - LCEL - Electrical Intermediate Scheduled
09/02/2026 COT - LCPL - Plumbing Intermediate Scheduled
09/02/2026 COT - LCBU - Framing Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .