Permit: TC-COM-0625-01276
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
1400 W VALENCIA RD UNIT 130
Address NEW:
1400 W VALENCIA RD UNIT 130
Apply Date:
06/30/2025
Applicant:
Glenn Patching
Description:
C of O REVIEW, NO NEW CONSTRUCTION
Permit Reviews
Permit Number - TC-COM-0625-01276
Permit Status: Complete
Permit Description: C of O REVIEW, NO NEW CONSTRUCTION
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/08/2025 | COMMERCIAL REVIEW - FULL v.4 | 10/30/2025 | APPROVED |
| 07/03/2025 | COMMERCIAL REVIEW - FULL v.1 | 07/03/2025 | REQUIRES RESUBMIT |
| 10/07/2025 | COMMERCIAL REVIEW - FULL v.3 | 10/07/2025 | REQUIRES RESUBMIT |
| 10/30/2025 | RESTAMP - COMMERCIAL v.1 | 10/31/2025 | APPROVED |
| 08/13/2025 | COMMERCIAL REVIEW - FULL v.2 | 09/08/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0625-01276
Permit Status: Complete
Permit Description: C of O REVIEW, NO NEW CONSTRUCTION
| Date | Description | Comments |
|---|---|---|
| 07/03/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0625-01276
Permite Description: C of O REVIEW, NO NEW CONSTRUCTION
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2025 | COT - LCBU - Building Final | N/A | Re-inspection required | 11-5-25: restrooms are not ADA compliant- see ANSI & 2018 IBC for details. Flush control valve on water closet shall be on accessible side, check restroom sign height, missing knee guards at lavatories, missing vertical grab bar, grab bar behind water closet must be minimum of 36", mirror height not compliant. A pan is required for water heater in closet, wrap hot line of water heater with a minimum of R3 insulation, seal all water closets. Access to rooftop and electrical panels are required. |
| 11/05/2025 | COT - LCME - Mechanical Final | N/A | Re-inspection required | 11-5-25: restrooms are not ADA compliant- see ANSI & 2018 IBC for details. Flush control valve on water closet shall be on accessible side, check restroom sign height, missing knee guards at lavatories, missing vertical grab bar, grab bar behind water closet must be minimum of 36", mirror height not compliant. A pan is required for water heater in closet, wrap hot line of water heater with a minimum of R3 insulation, seal all water closets. Access to rooftop and electrical panels are required. |
| 11/05/2025 | COT - LCEL - Electrical Final | N/A | Re-inspection required | 11-5-25: restrooms are not ADA compliant- see ANSI & 2018 IBC for details. Flush control valve on water closet shall be on accessible side, check restroom sign height, missing knee guards at lavatories, missing vertical grab bar, grab bar behind water closet must be minimum of 36", mirror height not compliant. A pan is required for water heater in closet, wrap hot line of water heater with a minimum of R3 insulation, seal all water closets. Access to rooftop and electrical panels are required. |
| 11/05/2025 | COT - LCPL - Plumbing Final | N/A | Re-inspection required | 11-5-25: restrooms are not ADA compliant- see ANSI & 2018 IBC for details. Flush control valve on water closet shall be on accessible side, check restroom sign height, missing knee guards at lavatories, missing vertical grab bar, grab bar behind water closet must be minimum of 36", mirror height not compliant. A pan is required for water heater in closet, wrap hot line of water heater with a minimum of R3 insulation, seal all water closets. Access to rooftop and electrical panels are required. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0625-01276
Permit Description: C of O REVIEW, NO NEW CONSTRUCTION
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2025 | COT - FCON - Fire - Final | Passed | ||
| 12/07/2025 | COT - LCBU - Building Final | Passed | ||
| 12/07/2025 | COT - LCME - Mechanical Final | Passed | ||
| 12/07/2025 | COT - LCEL - Electrical Final | Passed | ||
| 12/07/2025 | COT - LCPL - Plumbing Final | Passed | ||
| 12/05/2025 | BULD - Electrical Clearance | Passed | ||
| 12/05/2025 | COT - BULD - SWG Clearance | Passed | ||
| 12/05/2025 | COT - HCBU - TCO | Passed |