Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
06/23/2025
Applicant:
Stephen Benge
Description:
Renovation of office space

Permit Reviews

Permit Number - TC-COM-0625-01201
Permit Status: Complete
Permit Description: Renovation of office space
Start Date Submittal Complete Date Status  
07/21/2025 COMMERCIAL REVIEW - LIMITED v.3 08/04/2025 APPROVED Review Details
06/26/2025 COMMERCIAL REVIEW - LIMITED v.1 07/10/2025 REQUIRES RESUBMIT Review Details
11/12/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/17/2025 APPROVED Review Details
08/04/2025 RESTAMP - COMMERCIAL v.1 08/07/2025 APPROVED Review Details
07/21/2025 COMMERCIAL REVIEW - LIMITED v.2 07/21/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-COM-0625-01201
Permit Status: Complete
Permit Description: Renovation of office space
Date Description Comments
08/04/2025 AIR BALANCING REPORT IS REQUIRED.
06/26/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
06/26/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/04/2025 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-COM-0625-01201
Permite Description: Renovation of office space
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/12/2025 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-COM-0625-01201
Permit Description: Renovation of office space
Total Completed Inspections - 13
Date Description Inspector Results Comments
08/12/2025 COT - LCBU - Preslab Passed
08/12/2025 COT - LCBU - Framing Passed
08/12/2025 COT - LCEL - Electrical Above Ceiling Passed
08/12/2025 COT - LCPL - Plumbing Intermediate Passed
08/12/2025 COT - LCPL - Rough Soil Passed
08/12/2025 COT - LCEL - Electrical Intermediate Passed
08/12/2025 COT - LCME - Mechanical Intermediate Passed
08/27/2025 COT - LCEL - Electrical Final Passed
08/27/2025 COT - FCON - Sprinkler - Final Passed
08/27/2025 COT - FCON - Fire - Final Passed
08/29/2025 COT - LCPL - Plumbing Final Passed
08/29/2025 COT - LCME - Mechanical Final Passed
08/29/2025 COT - LCBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
TC-C0M-0625-01201 BALANCE REPT_V1.PDF DOCUMENTS VIEW
TC-COM-0625-01201 WATER ANALYSIS-2025-11-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
TC-COM-0625-01201 LUXE WELLNESS V-2 TI 25-0721_V1.PDF DOCUMENTS VIEW