Permit: TC-COM-0625-01191
Permit Details
Apply Date:
06/20/2025
Applicant:
Jimmy Hoskie
Description:
Replace and repair existing ceiling. beam failure at second level
Permit Reviews
Permit Number - TC-COM-0625-01191
Permit Status: Complete
Permit Description: Replace and repair existing ceiling. beam failure at second level
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/02/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/05/2025 | APPROVED |
| 06/26/2025 | COMMERCIAL REVIEW - LIMITED v.1 | 07/08/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-COM-0625-01191
Permit Status: Complete
Permit Description: Replace and repair existing ceiling. beam failure at second level
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 07/08/2025 | SPECIAL INSPECTION OF STRUCTURAL WOOD FRAMING IS REQUIRED. |
Conditions
Permit Number - TC-COM-0625-01191
Permit Status: Complete
Permit Description: Replace and repair existing ceiling. beam failure at second level
| Date | Description | Comments |
|---|---|---|
| 07/08/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 06/26/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 07/08/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0625-01191
Permit Description: Replace and repair existing ceiling. beam failure at second level
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/10/2025 | COT - LCBU - Roof Nailing | Passed | ||
| 09/10/2025 | COT - LCBU - Framing | Passed | ||
| 09/30/2025 | COT - FCON - Fire - Final | Passed | ||
| 09/30/2025 | COT - LCBU - Building Final | Passed |