Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Commercial Building
Address NEW:
6520 S I19 FRONTAGE RD
Apply Date:
06/19/2025
Applicant:
Jaris Brenneman
Description:
Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls, parking, sidewalks or landscape.

Permit Reviews

Permit Number - TC-COM-0625-01187
Permit Status: Inspections complete
Permit Description: Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls, parking, sidewalks or landscape.
Start Date Submittal Complete Date Status  
06/24/2025 COMMERCIAL REVIEW - LIMITED v.1 07/14/2025 APPROVED Review Details

Conditions

Permit Number - TC-COM-0625-01187
Permit Status: Inspections complete
Permit Description: Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls, parking, sidewalks or landscape.
Date Description Comments
06/24/2025 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
06/24/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-COM-0625-01187
Permit Description: Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls, parking, sidewalks or landscape.
Total Completed Inspections - 6
Date Description Inspector Results Comments
04/07/2026 COT - FCON - Fire - Final Passed
04/07/2026 COT - LCBU - Building Final Passed 4-7-26: building final approved.
04/07/2026 COT - LCEL - Electrical Final Passed 4-7-26: electrical final approved.
04/07/2026 COT - LCME - Mechanical Final Passed 4-7-26: mechanical final approved.
04/07/2026 COT - LCPL - Plumbing Final Passed 4-7-26: plumbing final approved.
05/12/2026 COT - LCPL - Rough Soil Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-05_1463 G3 BEV 25-0609_V1.PDF DOCUMENTS VIEW