Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0625-01178
Permit Details
Apply Date:
06/17/2025
Applicant:
Brendan Guthrie
Description:
Minor restaurant use tenant improvement within existing shell building. Project includes; modifying existing trusses to reinforce roof support.
Permit Reviews
Permit Number - TC-COM-0625-01178
Permit Status: Complete
Permit Description: Minor restaurant use tenant improvement within existing shell
building. Project includes; modifying existing trusses to reinforce roof
support.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/20/2025 | RESTAMP - COMMERCIAL v.1 | 08/20/2025 | APPROVED |
| 06/20/2025 | COMMERCIAL REVIEW - FULL v.1 | 07/14/2025 | REQUIRES RESUBMIT |
| 10/10/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/14/2025 | APPROVED |
| 08/11/2025 | COMMERCIAL REVIEW - FULL v.2 | 08/20/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0625-01178
Permit Status: Complete
Permit Description: Minor restaurant use tenant improvement within existing shell
building. Project includes; modifying existing trusses to reinforce roof
support.
| Date | Description | Comments |
|---|---|---|
| 08/19/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 08/19/2025 | NESHAP Permit is required. (Utilized with commercial demolition permits) | |
| 06/20/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0625-01178
Permit Description: Minor restaurant use tenant improvement within existing shell
building. Project includes; modifying existing trusses to reinforce roof
support.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2025 | COT - LCBU - Framing | Passed | ||
| 11/07/2025 | COT - LCBU - Roof Nailing | Passed | Ok to dry-in roof system. | |
| 11/13/2025 | COT - LCBU - Building Final | Passed | Roof system completed; shingle system in place. |