Permit: TC-COM-0625-01145
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
899 E SILVERLAKE RD BLDG 1
Address NEW:
899 E SILVERLAKE RD BLDG 1
Apply Date:
06/11/2025
Applicant:
Diamond McIntosh
Description:
1,897 Linear Feet of Conveyor will be Installed ? One Sorter ? Chutes ? Will be installing platforms, mezzanines ? Only Floor Supported
Permit Reviews
Permit Number - TC-COM-0625-01145
Permit Status: Complete
Permit Description: 1,897 Linear Feet of Conveyor will be Installed
? One Sorter
? Chutes
? Will be installing platforms, mezzanines
? Only Floor Supported
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/02/2026 | SPECIAL INSPECTION REVIEW v.1 | 03/03/2026 | REQUIRES RESUBMIT |
| 06/17/2025 | COMMERCIAL REVIEW - FULL v.2 | 07/10/2025 | REQUIRES RESUBMIT |
| 06/12/2025 | COMMERCIAL REVIEW - FULL v.1 | 06/12/2025 | REQUIRES RESUBMIT |
| 03/04/2026 | SPECIAL INSPECTION REVIEW v.2 | 03/05/2026 | APPROVED |
| 07/15/2025 | COMMERCIAL REVIEW - FULL v.3 | 07/21/2025 | APPROVED |
| 07/21/2025 | RESTAMP - COMMERCIAL v.1 | 07/28/2025 | APPROVED |
Conditions
Permit Number - TC-COM-0625-01145
Permit Status: Complete
Permit Description: 1,897 Linear Feet of Conveyor will be Installed
? One Sorter
? Chutes
? Will be installing platforms, mezzanines
? Only Floor Supported
| Date | Description | Comments |
|---|---|---|
| 06/17/2025 | The Permit Application and Construction Plan Address needs to be the same. Please provide address and building number on construction plans. | |
| 07/07/2025 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 06/12/2025 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 06/12/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 07/07/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 07/07/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 07/07/2025 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0625-01145
Permite Description: 1,897 Linear Feet of Conveyor will be Installed
? One Sorter
? Chutes
? Will be installing platforms, mezzanines
? Only Floor Supported
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 11/17/2025 | COT - HCEL - Electrical Progress | N/A | Partial Pass | All electrical installed from column C - G. From C - column 5. IP1 feeding thee distribution panels (2,3,4) that feed 480 to motors also feeding the minin panels. 11/17/2025 |
| 11/20/2025 | ENGR Engineering Final | N/A | Not Ready | Construction equipment still on site. Temp fencing needs to be removed. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0625-01145
Permit Description: 1,897 Linear Feet of Conveyor will be Installed
? One Sorter
? Chutes
? Will be installing platforms, mezzanines
? Only Floor Supported
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2025 | COT - FCON - Fire - Final | Passed | ||
| 11/20/2025 | BULD - Electrical Clearance | Passed | No clearance required. | |
| 11/24/2025 | COT - HCEL - Electrical Progress | Passed | ||
| 11/24/2025 | COT - HCEL - Electrical Intermediate | Passed | ||
| 11/24/2025 | COT - HCBU - Building Progress | Passed | ||
| 01/13/2026 | ENGR Engineering Final | Passed | ||
| 01/13/2026 | TRSP - ROW - Final/Close-Out | Passed | ||
| 02/12/2026 | COT - HCEL - Electrical Final | Passed | 2-12-26: electrical final approved. | |
| 02/18/2026 | COT - HCBU - Building Final | Passed |