Permit: TC-COM-0624-01147
Permit Details
Status:
Needs Resubmittal
Type:
Commercial Building
Address:
1500 E TUCSON MARKETPLACE BL
Address NEW:
1500 E TUCSON MARKETPLACE BL
Apply Date:
06/14/2024
Applicant:
Alexis Neuroth
Description:
Ground Up Retail Building
Permit Reviews
Permit Number - TC-COM-0624-01147
Permit Status: Needs resubmittal
Permit Description: Ground Up Retail Building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/17/2024 | COMMERCIAL REVIEW - FULL v.1 | 07/26/2024 | REQUIRES RESUBMIT |
| 05/06/2025 | RESTAMP - COMMERCIAL v.1 | 05/12/2025 | APPROVED |
| 10/08/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 11/06/2025 | REQUIRES RESUBMIT |
| 11/27/2024 | RESTAMP - COMMERCIAL v.1 | 12/03/2024 | APPROVED |
| 11/14/2025 | COMMERCIAL REVIEW - FULL REVISION v.2 | 12/10/2025 | REQUIRES RESUBMIT |
| 12/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/10/2024 | APPROVED |
| 02/24/2025 | COMMERCIAL REVIEW - FULL v.1 | 04/01/2025 | REQUIRES RESUBMIT |
| 04/23/2025 | COMMERCIAL REVIEW - FULL v.2 | 04/28/2025 | REQUIRES RESUBMIT |
| 10/24/2024 | COMMERCIAL REVIEW - FULL v.3 | 11/27/2024 | APPROVED |
| 08/19/2025 | COMMERCIAL REVIEW - FULL REVISION v.1 | 09/11/2025 | APPROVED |
| 05/01/2025 | COMMERCIAL REVIEW - FULL v.3 | 05/06/2025 | APPROVED |
| 09/12/2024 | COMMERCIAL REVIEW - FULL v.2 | 10/14/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-COM-0624-01147
Permit Status: Needs resubmittal
Permit Description: Ground Up Retail Building
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 10/30/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. |
| 10/30/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 10/30/2024 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
| 10/30/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. |
| 10/30/2024 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. |
| 10/30/2024 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
| 11/14/2025 | Please submit a separate sign permit for an signs associated with this projet. |
| 12/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Conditions
Permit Number - TC-COM-0624-01147
Permit Status: Needs resubmittal
Permit Description: Ground Up Retail Building
| Date | Description | Comments |
|---|---|---|
| 06/17/2024 | Please contact Pima County Addressing to verify the official address. Addressing@pima.gov or 520-724-9512 | |
| 06/17/2024 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
| 10/29/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. |
Outstanding Inspections
Permit Status: Needs Resubmittal
Permit Number: TC-COM-0624-01147
Permite Description: Ground Up Retail Building
Total Outstanding Inspections - 15
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2025 | COT - HCEL - Grounding/Bonding | N/A | Partial Pass | 5/12/25: partial for UFER |
| 08/06/2025 | COT - FCON - Sprinkler - Final | N/A | Partial Pass | Riser stub out and thrust block were looked at |
| 05/29/2025 | COT - HCPL - Rough Soil | N/A | Partial Pass | 5/29/2025 Restrooms 104 and 105 janitors closet 108 restroom hall 103 on the water plan detail 3 on page P1.2. Approved okay to backfill progress areas. Shading is required. 8” roof drain on Grid line E column 9. 8” roof drain on Grid line B column 9. Okay to proceed progress areas. Shading is required for backfill. Partial pass. Main water line 3” riser in place at Grid line A column 5. |
| 10/10/2025 | COT - HCEL - Electrical Underground | N/A | Not Ready | |
| 10/23/2025 | COT - HCPL - Plumbing Intermediate | N/A | Canceled | 10-23-25: canceled by contractor. |
| 10/23/2025 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | 10-23-25: verified pookie joints for ducts at Gridline D-F/2-7. Okay to continue with construction at progress areas. |
| 11/06/2025 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 11/6/25: Electrical in wall approved at exterior walls at Area B (GL A/1 - D/1), Area A (GL E.5/1 - H/1-3), Area D (GL G/6 - F/8) |
| 10/08/2025 | COT - HCBU - Preslab | N/A | Partial Pass | Slab area Northeast corner of building , North of archery range. Ok to,place concrete in slab area. |
| 11/24/2025 | BULD - Electrical Clearance | N/A | Partial Pass | Clearance for TEP ECO. HOUSE PANEL. 11/24/2025 |
| 12/02/2025 | COT - HCEL - Outdoor Lighting | N/A | Partial Pass | Partial pass. Total of 7 light pole bases on the west end of building. Okay for concrete placement. Refer to highlighted notes on the site lighting page. 12/2/2025 |
| 10/08/2025 | COT - HCME - Mechanical Progress | N/A | Partial Pass | West offices and restrooms; archery range: ducts wrapped except for joints. Ok to continue wrapping existing duct systems. |
| 12/31/2025 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | |
| 05/16/2025 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 4-29-25, excavation/reinforcement for 14 column spread footers on south end verified per plan. Detail F-6 calls for 7-#5 rebar top/bottom and F-8-calls for 9-#6 rebar top/bottom. Okay to pour footers at progress areas. 4-30-25, excavation/reinforcement on a total of 18 interior spread footings verified per approved plans.See Detail's F-6 & F4.5, F3X6. Okay to pour concrete. 5-2-25, excavation/reinforcement on a total of 33 spread footings verified per approved plans-see detail F-4, F-6, F-8. Okay to pour concrete. 5/12/25: reinforcement per plans at exterior continuous perimeter footer at GL (A/0-10, A-D/11). Ok to proceed with progress areas. 5/16/25: reinforcement per approved plans at continuous perimeter panel footings from GL A-G.5/2-2 |
| 12/16/2025 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 12-16-25: in wall electrical at gang restrooms, Area A, LSS room, cash count room, ap office approved-okay to continue with construction at progress areas |
| 10/23/2025 | COT - HCBU - Framing | N/A | Partial Pass | 10-23-25: interior metal framing at Gridline A-B/1-9 approved. Okay to continue with construction at progress areas. electrical room 109 & framing at tower between Gridline A/5-6 approved. |