Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Commercial Building
Apply Date:
06/11/2024
Applicant:
Andrew Venne
Description:
Landlord Interior Remodel 103,105,141,151

Permit Reviews

Permit Number - TC-COM-0624-01124
Permit Status: Issued
Permit Description: Landlord Interior Remodel 103,105,141,151
Start Date Submittal Complete Date Status  
05/26/2026 COMMERCIAL REVIEW - FULL v.1 06/01/2026 REQUIRES RESUBMIT Review Details
06/02/2026 COMMERCIAL REVIEW - FULL REVISION v.1 06/24/2026 APPROVED Review Details
08/31/2026 SPECIAL INSPECTION REVIEW v.1 09/02/2026 REQUIRES RESUBMIT Review Details
11/12/2024 RESTAMP - COMMERCIAL v.1 12/06/2024 APPROVED Review Details
06/14/2024 COMMERCIAL REVIEW - FULL v.1 07/19/2024 REQUIRES RESUBMIT Review Details
11/05/2024 COMMERCIAL REVIEW - FULL v.3 11/06/2024 REQUIRES RESUBMIT Review Details
09/17/2026 SPECIAL INSPECTION REVIEW v.2 09/21/2026 APPROVED Review Details
08/08/2024 COMMERCIAL REVIEW - FULL v.2 10/28/2024 REQUIRES RESUBMIT Review Details
11/07/2024 COMMERCIAL REVIEW - FULL v.4 11/12/2024 APPROVED Review Details
09/02/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/03/2026 APPROVED Review Details

Conditions

Permit Number - TC-COM-0624-01124
Permit Status: Issued
Permit Description: Landlord Interior Remodel 103,105,141,151
Date Description Comments
06/14/2024 Please contact Pima County Addressing to verify the official address(s). Addressing@pima.gov or 520-724-9512
11/11/2024 AIR BALANCING REPORT IS REQUIRED.
06/14/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/11/2024 Masonry Inspection Report submittal review is required.
11/11/2024 SPECIAL INSPECTION FOR wood roof strengthening IS REQUIRED
11/11/2024 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
11/11/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-COM-0624-01124
Permite Description: Landlord Interior Remodel 103,105,141,151
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
08/20/2026 COT - HCBU - Building Above Ceiling N/A Not Applicable
08/20/2026 COT - HCME - Mechanical Above Ceiling N/A Not Applicable
08/20/2026 COT - HCPL - Plumbing Above Ceiling N/A Canceled
COT - FCON - Sprinkler - Final N/A Not Ready Sprinkler riser shall have its annual inspection.
COT - FCON - Alarm - Final N/A Not Ready Building Fire Alarm system had an active general alarm on the panel. Notified Central Alarm to come out and address the issue.
COT - FCON - Fire - Final N/A Not Ready Need to address Fire Alarm issue.

Completed Inspections

Permit Status: Issued
Permit Number: TC-COM-0624-01124
Permit Description: Landlord Interior Remodel 103,105,141,151
Total Completed Inspections - 18
Date Description Inspector Results Comments
11/20/2025 COT - HCBU - Masonry Pregrout Passed Masonry by SI. Looked at electric and framing in North side walls, including both permits.
12/02/2025 COT - HCEL - Electrical Intermediate Passed
12/02/2025 COT - HCME - Mechanical Intermediate Passed
12/02/2025 COT - HCPL - Plumbing Intermediate Passed
12/02/2025 COT - HCBU - Framing Passed
02/06/2026 COT - HCEL - Electrical Underground Passed
02/23/2026 COT - HCBU - Preslab Passed landing and stairs first added door
02/23/2026 COT - HCPL - Rough Soil Passed added floor sink
03/16/2026 COT - HCEL - Electrical Above Ceiling Passed
06/10/2026 BULD - Electrical Clearance Passed 6.10.26
TEP CLEARANCE: INCR
Unit 103; and UNIT 105
08/20/2026 TRSP - ROW - Notice of Completion Passed
08/20/2026 ENGR Engineering Final Passed Inside unit 103 shell work is complete.
08/20/2026 COT - HCEL - Outdoor Lighting Passed
09/23/2026 COT - HCBU - Building Final Passed
09/23/2026 COT - HCEL - Electrical Final Passed
09/23/2026 COT - HCME - Mechanical Final Passed
09/23/2026 COT - HCPL - Plumbing Final Passed
10/02/2026 COT - FCON - Fire - Final Passed Shell only no occupancy

Scheduled Inspections

Scheduled Inspections - TC-COM-0624-01124
Status: Issued
Description: Landlord Interior Remodel 103,105,141,151
Scheduled Date Description Entered By Entered Date
09/14/2026 COT - FCON - Sprinkler - Final Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
5851 E SPEEDWAY BLVD 103 TC-COM-0624-01124._V1.PDF DOCUMENTS VIEW
5851 E SPEEDWAY WATER REPORT-2026-08-25_V1.PDF DOCUMENTS VIEW
AIR BAL. RPT-5851 E SPEEDWAY LANDLORD TI FLOOR PLAN-2026-08-25_V1.PDF DOCUMENTS VIEW
5851 E SPEEDWAY NARRITIVE 05-27-26_V1.PDF DOCUMENTS VIEW
7_A-1 THRU E6.1 5851 E SPEEDWAY LANDLORD PLAN 103 5-27-26_D3_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-4_A-1 THRU E6.1 5851 E SPEEDWAY LANDLORD PLAN 11-05-24_D2_V4.PDF DOCUMENTS VIEW
4_SIGNED SPECIAL INSPECTION FROM 5851 E SPEEDWAY MASORNY AND WOOD_V1.PDF DOCUMENTS VIEW
4_SUPPLEMENTAL STRUCTURAL CALCULATIONS - 5851 E SPEEDWAY_V1.PDF DOCUMENTS VIEW
4_SYSTEM DESIGN REPORT - COPY-2_V3.PDF DOCUMENTS VIEW