Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Commercial Building
Apply Date:
06/09/2024
Applicant:
Clemente Noriega
Description:
Fire Restoration Unit 218. (Main permit for shared plan set).

Permit Reviews

Permit Number - TC-COM-0624-01104
Permit Status: Inspections
Permit Description: Fire Restoration Unit 218. (Main permit for shared plan set).
Start Date Submittal Complete Date Status  
06/11/2024 COMMERCIAL REVIEW - FULL v.1 07/16/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-COM-0624-01104
Permit Status: Inspections
Permit Description: Fire Restoration Unit 218. (Main permit for shared plan set).
Total Outstanding Activity Conditions - 2
Date Name
07/16/2024 AIR BALANCING REPORT IS REQUIRED.
07/16/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-COM-0624-01104
Permite Description: Fire Restoration Unit 218. (Main permit for shared plan set).
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
12/18/2024 COT - LCBU - Framing N/A Not Ready
05/21/2025 COT - LCBU - Building Final N/A Not Ready
05/21/2025 COT - BULD - SWG Clearance N/A Not Applicable
05/21/2025 COT - LCEL - Electrical Final N/A Not Ready

Completed Inspections

Permit Status: Inspections
Permit Number: TC-COM-0624-01104
Permit Description: Fire Restoration Unit 218. (Main permit for shared plan set).
Total Completed Inspections - 11
Date Description Inspector Results Comments
12/18/2024 COT - LCBU - Roof Nailing Passed
02/27/2025 COT - LCBU - Framing Passed
02/27/2025 COT - LCME - Mechanical Intermediate Passed
02/27/2025 COT - LCEL - Electrical Intermediate Passed
04/02/2025 BULD - Electrical Clearance Passed Clearance for TEP RECN. UNIT #218. 4/2/2025
05/21/2025 COT - FCON - Fire - Final Passed
05/21/2025 ENGR Engineering Final Passed Site is clean and safe, in accordance with approved plans. CofO ready.
05/22/2025 TRSP - ROW - Final/Close-Out Passed
05/21/2025 COT - LCPL - Plumbing Final Passed
05/21/2025 COT - LCME - Mechanical Final Passed
05/21/2025 COT - LCEL - Electrical Above Ceiling Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-PLAN SET_V1.PDF DOCUMENTS VIEW
UNIT 218 MANUAL J DRAFT_V1.PDF DOCUMENTS VIEW