Permit: TC-COM-0623-01623
Permit Details
Apply Date:
06/30/2023
Applicant:
Shawn Reese
Description:
THIS IS A RETAIL TENANT IMPROVEMENT PROJECT, DESIGNATED AS GROUP M (MERCANTILE). WORK TO INCLUDE, BUT NOT LIMITED TO: DEMOLITION OF EXISTING NON-STRUCTURAL TENANT IMPROVEMENTS; NEW INTERIOR PARTITION WALLS, CEILINGS, FINISHES; NEW INTERIOR STOREFRONT SYSTEM AND STOREFRONT CLADDING; NEW EGRESS DOOR; NEW ELECTRICAL DISTRIBUTION AND LIGHTING; NEW MECHANICAL SYSTEM AND DISTRIBUTION; NEW PLUMBING WORK AS REQUIRED FOR NEW PLUMBING FIXTURES.
Permit Reviews
Permit Number - TC-COM-0623-01623
Permit Status: Complete
Permit Description: THIS IS A RETAIL TENANT IMPROVEMENT PROJECT, DESIGNATED AS GROUP M (MERCANTILE). WORK TO INCLUDE, BUT NOT LIMITED TO: DEMOLITION OF EXISTING NON-STRUCTURAL TENANT IMPROVEMENTS; NEW INTERIOR PARTITION WALLS, CEILINGS, FINISHES; NEW INTERIOR STOREFRONT SYSTEM AND STOREFRONT CLADDING; NEW EGRESS DOOR; NEW ELECTRICAL DISTRIBUTION AND LIGHTING; NEW MECHANICAL SYSTEM AND DISTRIBUTION; NEW PLUMBING WORK
AS REQUIRED FOR NEW PLUMBING FIXTURES.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/24/2023 | COMMERCIAL REVIEW - FULL v.1 | 12/19/2023 | APPROVED |
06/30/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/31/2023 | REQUIRES RESUBMIT |
08/14/2023 | RESTAMP - COMMERCIAL v.1 | 08/17/2023 | APPROVED |
08/11/2023 | COMMERCIAL REVIEW - FULL v.2 | 08/14/2023 | APPROVED |
11/01/2023 | COMMERCIAL REVIEW - FULL v.1 | 11/20/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0623-01623
Permit Status: Complete
Permit Description: THIS IS A RETAIL TENANT IMPROVEMENT PROJECT, DESIGNATED AS GROUP M (MERCANTILE). WORK TO INCLUDE, BUT NOT LIMITED TO: DEMOLITION OF EXISTING NON-STRUCTURAL TENANT IMPROVEMENTS; NEW INTERIOR PARTITION WALLS, CEILINGS, FINISHES; NEW INTERIOR STOREFRONT SYSTEM AND STOREFRONT CLADDING; NEW EGRESS DOOR; NEW ELECTRICAL DISTRIBUTION AND LIGHTING; NEW MECHANICAL SYSTEM AND DISTRIBUTION; NEW PLUMBING WORK
AS REQUIRED FOR NEW PLUMBING FIXTURES.
Date | Description | Comments |
---|---|---|
06/30/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0623-01623
Permite Description: THIS IS A RETAIL TENANT IMPROVEMENT PROJECT, DESIGNATED AS GROUP M (MERCANTILE). WORK TO INCLUDE, BUT NOT LIMITED TO: DEMOLITION OF EXISTING NON-STRUCTURAL TENANT IMPROVEMENTS; NEW INTERIOR PARTITION WALLS, CEILINGS, FINISHES; NEW INTERIOR STOREFRONT SYSTEM AND STOREFRONT CLADDING; NEW EGRESS DOOR; NEW ELECTRICAL DISTRIBUTION AND LIGHTING; NEW MECHANICAL SYSTEM AND DISTRIBUTION; NEW PLUMBING WORK
AS REQUIRED FOR NEW PLUMBING FIXTURES.
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/23/2023 | COT - HCBU - Framing | N/A | Not Ready | |
10/23/2023 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 10/23/23: 4 new underground electric conduits on north and west wall of the showroom approved to cover. |
01/03/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | Not required, no gas in store. |
01/03/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | Approved to obtain level 2 TCO |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0623-01623
Permit Description: THIS IS A RETAIL TENANT IMPROVEMENT PROJECT, DESIGNATED AS GROUP M (MERCANTILE). WORK TO INCLUDE, BUT NOT LIMITED TO: DEMOLITION OF EXISTING NON-STRUCTURAL TENANT IMPROVEMENTS; NEW INTERIOR PARTITION WALLS, CEILINGS, FINISHES; NEW INTERIOR STOREFRONT SYSTEM AND STOREFRONT CLADDING; NEW EGRESS DOOR; NEW ELECTRICAL DISTRIBUTION AND LIGHTING; NEW MECHANICAL SYSTEM AND DISTRIBUTION; NEW PLUMBING WORK
AS REQUIRED FOR NEW PLUMBING FIXTURES.
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2023 | COT - HCEL - Electrical Above Ceiling | Passed | Hard lids. | |
10/26/2023 | COT - HCBU - Framing | Passed | ||
10/26/2023 | COT - HCEL - Electrical Progress | Passed | ||
10/31/2023 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
10/31/2023 | COT - HCBU - Building Progress | Passed | ||
11/13/2023 | COT - HCBU - Building Above Ceiling | Passed | ||
11/13/2023 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
11/15/2023 | COT - HCEL - Electrical Intermediate | Passed | ||
11/15/2023 | COT - HCPL - Plumbing Intermediate | Passed | ||
11/15/2023 | COT - HCME - Mechanical Above Ceiling | Passed | ||
11/28/2023 | ENGR Engineering Final | Passed | ||
12/14/2023 | COT - HCME - Mechanical Intermediate | Passed | ||
12/14/2023 | COT - HCPL - Plumbing Progress | Passed | ||
12/14/2023 | COT - HCPL - Plumbing Final | Passed | ||
12/14/2023 | COT - HCME - Mechanical Progress | Passed | ||
12/19/2023 | COT - FCON - Sprinkler - Final | Passed | ||
12/19/2023 | COT - FCON - Alarm - Final | Passed | ||
01/03/2024 | COT - HCME - Mechanical Final | Passed | 1-3-2024: Contractor has uploaded air balance report to the portal. | |
01/03/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
01/03/2024 | BULD - Electrical Clearance | Passed | Electrical meter was never removed from service. No electrical clearance required. | |
01/03/2024 | COT - HCBU - Building Final | Passed | Store remodel is complete, kiosks are installed, televisions are installed and operational. Okay to issue a Level 2 Certificate of Occupancy, to allow them to bring in merchandise and train new employees. | |
01/03/2024 | COT - HCEL - Electrical Final | Passed | Electrical work is complete, panel is properly labeled, lights and electrical outlets are installed and operational. | |
01/09/2024 | COT - HCBU - CofO | Passed | ||
01/09/2024 | COT - FCON - Fire - Final | Passed |