Permit: TC-COM-0623-01596
Permit Details
Apply Date:
06/28/2023
Applicant:
Thomas Forristal
Description:
New Building for a Fast Casual Restuarant with a drive thru.
Permit Reviews
Permit Number - TC-COM-0623-01596
Permit Status: Complete
Permit Description: New Building for a Fast Casual Restuarant with a drive thru.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/20/2024 | APPROVED |
06/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/12/2024 | APPROVED |
11/08/2023 | COMMERCIAL REVIEW - FULL v.4 | 11/15/2023 | APPROVED |
06/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/18/2024 | APPROVED |
06/29/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/27/2023 | REQUIRES RESUBMIT |
08/23/2023 | COMMERCIAL REVIEW - FULL v.2 | 09/21/2023 | REQUIRES RESUBMIT |
10/30/2023 | COMMERCIAL REVIEW - FULL v.3 | 11/02/2023 | REQUIRES RESUBMIT |
11/15/2023 | RESTAMP - COMMERCIAL v.1 | 11/16/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0623-01596
Permit Status: Complete
Permit Description: New Building for a Fast Casual Restuarant with a drive thru.
Date | Description | Comments |
---|---|---|
11/15/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
06/29/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
06/20/2024 | COUNTY HEALTH INSPECTION IS REQUIRED - PLEASE PROVIDE DOCUMENTATION THAT THE INSPECTION HAS BEEN COMPLETED AND PASSED. | |
06/18/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
11/15/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
11/15/2023 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
07/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/18/2024 | Masonry Inspection Report submittal review is required. | |
06/21/2024 | WATER STERILIZATION REPORT IS REQUIRED. | |
11/15/2023 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0623-01596
Permite Description: New Building for a Fast Casual Restuarant with a drive thru.
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/30/2023 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Partial pass. Vertical and horizontal rebar per plan in footings throughout building along with equipment pad. Okay for concrete placement. 11/30/2023 |
12/05/2023 | COT - HCBU - Masonry Pregrout | N/A | Partial Pass | 12/5/23 for first course CMU perimeter wall ok to place concrete |
12/20/2023 | COT - HCEL - Electrical Underground | N/A | Partial Pass | |
05/01/2024 | COT - HCME - Mechanical Progress | N/A | Partial Pass | Virtual approval for hood duct smoke test OK for first wrap on large hood only Partial for 2nd wrap of large duct Partial approval for small hood smoke test, ok for first wrap 5/1/24: 2nd wrap of small hood passed. |
12/27/2023 | COT - HCPL - Rough Soil | N/A | Partial Pass | |
COT - FCON - Hood System - Final | N/A | Not Ready | ||
06/13/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | Hood still needs inspection. |
06/18/2024 | COT - HCBU - TCO | N/A | Partial Pass | 6/18/24: LEVEL 4TCO |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0623-01596
Permit Description: New Building for a Fast Casual Restuarant with a drive thru.
Total Completed Inspections - 38
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/30/2023 | COT - HCEL - Grounding/Bonding | Passed | UFER is in place. 11/30/2023 | |
01/04/2024 | COT - HCBU - Preslab | Passed | ||
01/26/2024 | COT - HCBU - Excavation/Rebar/Zoning | Passed | Partial pass. Vertical and horizontal rebar per plan in footings throughout building along with equipment pad. Okay for concrete placement. 11/30/2023 1/26/24: footings for retaining wall passed. |
|
02/26/2024 | COT - HCBU - Masonry Pregrout | Passed | ||
03/20/2024 | COT - HCBU - Roof Nailing | Passed | ||
04/02/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
04/12/2024 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
05/01/2024 | COT - HCPL - Gas Pressure Test | Passed | ||
05/17/2024 | COT - HCEL - Electrical Underground | Passed | 12/20/23 inside building footprint ok to cover 4/19/25 Partial approval for secondary conduits from transformer, ok to cover 5/15/24: electrical underground for light pole bases and menu board per plan ok to backfill. 5/17/24: light pole bases per plan ok to pour. |
|
05/17/2024 | BULD - Electrical Clearance | Passed | 5/1/24: Not ready 5/17/24: ECO TEP clearance for 1385 E TUCSON MARKETPLACE BL |
|
06/11/2024 | COT - BULD - SWG Clearance | Passed | ||
06/11/2024 | COT - HCBU - Building Progress | Passed | ||
06/11/2024 | COT - HCBU - Framing | Passed | ||
06/11/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
06/11/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
06/11/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
06/11/2024 | COT - HCEL - Outdoor Lighting | Passed | ||
06/11/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
06/11/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
06/11/2024 | COT - HCME - Mechanical Progress | Passed | ||
06/11/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
06/11/2024 | COT - HCPL - Plumbing Progress | Passed | ||
06/11/2024 | COT - HCPL - Plumbing Roof Drains | Passed | ||
06/11/2024 | COT - HCPL - Rough Soil | Passed | ||
06/11/2024 | COT - HCPL - Sewer | Passed | ||
06/11/2024 | COT - LCPL - Yard Water Line | Passed | ||
06/11/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
06/11/2024 | ENGR Engineering Final | Passed | Everything around building footprint looks good, CO ready. | |
06/11/2024 | COT - HCEL - Electrical Progress | Passed | ||
06/11/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
06/11/2024 | COT - HCPL - Gas Final | Passed | ||
06/14/2024 | COT - FCON - Hood System - Final | Passed | ||
06/14/2024 | COT - FCON - Fire - Final | Passed | ||
06/18/2024 | COT - HCEL - Electrical Final | Passed | ||
06/18/2024 | COT - HCME - Mechanical Final | Passed | ||
06/18/2024 | COT - HCPL - Plumbing Final | Passed | ||
07/23/2024 | COT - HCBU - Building Final | Passed | 6/14/24: ok for Level 2 TCO 6/18/24: LEVEL 4TCO 7/23/24: Ok for CofO |
|
07/23/2024 | COT - HCBU - CofO | Passed | 6/14/24: ok for Level 2 TCO 6/18/24: LEVEL 4TCO 7/23/24: Ok for CofO |