Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-COM-0623-01562
Permit Details
Apply Date:
06/22/2023
Applicant:
Evan Bowen
Description:
TI of existing JTED High School building, including a canopy expansion and interior renovation for industrial technologies classes, enclosure of west stair, east breezeway soffit panel installation, and interior electrical renovations to existing classroom spaces.
Permit Reviews
Permit Number - TC-COM-0623-01562
Permit Status: Complete
Permit Description: TI of existing JTED High School building, including a canopy expansion and interior renovation for industrial technologies classes, enclosure of west stair, east breezeway soffit panel installation, and interior electrical renovations to existing classroom spaces.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/26/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/13/2023 | REQUIRES RESUBMIT |
07/14/2023 | COMMERCIAL REVIEW - FULL v.2 | 07/27/2023 | APPROVED |
01/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 01/29/2024 | APPROVED |
02/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/06/2024 | APPROVED |
01/31/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/02/2024 | REQUIRES RESUBMIT |
01/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/25/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-COM-0623-01562
Permit Status: Complete
Permit Description: TI of existing JTED High School building, including a canopy expansion and interior renovation for industrial technologies classes, enclosure of west stair, east breezeway soffit panel installation, and interior electrical renovations to existing classroom spaces.
Date | Description | Comments |
---|---|---|
07/18/2023 | Applies to All: Deferred submittal documents must be submitted and approved prior to installation of construction elements included in deferred submittal documents. | |
07/18/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
07/18/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
07/18/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
07/18/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
07/18/2023 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. | |
07/18/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
07/18/2023 | SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED. | |
07/18/2023 | Masonry Inspection Report submittal review is required. | |
07/18/2023 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
07/18/2023 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. | |
07/18/2023 | SPECIAL INSPECTION FOR WELDING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0623-01562
Permite Description: TI of existing JTED High School building, including a canopy expansion and interior renovation for industrial technologies classes, enclosure of west stair, east breezeway soffit panel installation, and interior electrical renovations to existing classroom spaces.
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/08/2023 | BULD - Electrical Clearance | N/A | Not Applicable | |
11/06/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | Level 4 TCO for Woodshop classroom. |
12/12/2023 | ENGR Engineering Final | N/A | Partial Pass | Sidewalk and curb for West section of parking lot continues as well as grading for asphalt for West sections of parking lot to be started the first week of January. |
12/28/2023 | COT - HCBU - Building Final | N/A | Partial Pass | 12/28/23 partial for weld shop, ok for level 2 TCO |
11/02/2023 | COT - HCEL - Electrical Progress | N/A | Partial Pass | 1L5 panel checked. Proper wire sizes, okay to proceed progress areas. Firewalls penetration all sealed up. Fire damper is in place. Existing shop in first floor north west corner adjoining new construction. 11/2/2023 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0623-01562
Permit Description: TI of existing JTED High School building, including a canopy expansion and interior renovation for industrial technologies classes, enclosure of west stair, east breezeway soffit panel installation, and interior electrical renovations to existing classroom spaces.
Total Completed Inspections - 23