Permit: TC-COM-0623-01529
Permit Details
Apply Date:
06/19/2023
Applicant:
Brian Langhoff
Description:
TENANT IMPROVEMENT OF TWO EXISTING SUITES CREATING A SINGLE SUITE FINANCIAL INSITUTION LOCATED IN AN EXISTING RETAIL SHELL BUILDING. THERE WILL BE An OVER NIGHT ATM FOR MEMBERS IN A SECURE VESTIBULE. THE BUILDING IS EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM, WHICH IS A DEFERRED SUBMITTAL.
Permit Reviews
Permit Number - TC-COM-0623-01529
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT OF TWO EXISTING SUITES CREATING A SINGLE SUITE FINANCIAL INSITUTION LOCATED IN AN EXISTING RETAIL SHELL BUILDING. THERE WILL BE An OVER NIGHT ATM FOR MEMBERS IN A SECURE VESTIBULE. THE BUILDING IS EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM, WHICH IS A DEFERRED SUBMITTAL.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/25/2024 | APPROVED |
07/19/2023 | RESTAMP - COMMERCIAL v.1 | 07/19/2023 | APPROVED |
06/23/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/19/2023 | APPROVED |
Conditions
Permit Number - TC-COM-0623-01529
Permit Status: Complete
Permit Description: TENANT IMPROVEMENT OF TWO EXISTING SUITES CREATING A SINGLE SUITE FINANCIAL INSITUTION LOCATED IN AN EXISTING RETAIL SHELL BUILDING. THERE WILL BE An OVER NIGHT ATM FOR MEMBERS IN A SECURE VESTIBULE. THE BUILDING IS EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM, WHICH IS A DEFERRED SUBMITTAL.
Date | Description | Comments |
---|---|---|
03/22/2024 | AIR BALANCING REPORT IS REQUIRED. | |
03/22/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-COM-0623-01529
Permite Description: TENANT IMPROVEMENT OF TWO EXISTING SUITES CREATING A SINGLE SUITE FINANCIAL INSITUTION LOCATED IN AN EXISTING RETAIL SHELL BUILDING. THERE WILL BE An OVER NIGHT ATM FOR MEMBERS IN A SECURE VESTIBULE. THE BUILDING IS EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM, WHICH IS A DEFERRED SUBMITTAL.
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/14/2023 | COT - HCME - Mechanical Progress | N/A | Not Applicable | |
12/14/2023 | COT - HCBU - Framing | N/A | Partial Pass | Partial pass. In wall framing approved, pending soffits and hard lids. Okay to proceed progress areas. 12/14/2023 |
11/09/2023 | COT - HCEL - Electrical Progress | N/A | Canceled | Canceled per contractor. 11/9/2023 |
02/14/2024 | COT - HCBU - Masonry Pregrout | N/A | Not Applicable | |
02/14/2024 | COT - FCON - Alarm - Final | N/A | Not Applicable | |
02/14/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
02/14/2024 | BULD - Electrical Clearance | N/A | Not Applicable | |
03/20/2024 | COT - FCON - Sprinkler - Final | N/A | Partial Pass | Sprinkler head in ATM vestibule blocked by mini-split. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-COM-0623-01529
Permit Description: TENANT IMPROVEMENT OF TWO EXISTING SUITES CREATING A SINGLE SUITE FINANCIAL INSITUTION LOCATED IN AN EXISTING RETAIL SHELL BUILDING. THERE WILL BE An OVER NIGHT ATM FOR MEMBERS IN A SECURE VESTIBULE. THE BUILDING IS EQUIPPED THROUGHOUT WITH AN AUTOMATIC SPRINKLER SYSTEM, WHICH IS A DEFERRED SUBMITTAL.
Total Completed Inspections - 18
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/08/2023 | COT - HCEL - Electrical Underground | Passed | Underground electrical is complete. Okay to backfill trenches. | |
11/08/2023 | COT - HCPL - Rough Soil | Passed | Underground plumbing is complete and under water test. Okay to backfill trenches. | |
11/14/2023 | COT - HCBU - Preslab | Passed | ||
12/14/2023 | COT - HCEL - Electrical Intermediate | Passed | ||
12/14/2023 | COT - HCME - Venting | Passed | All plumbing lines in walls well secured and under pressure. Okay for drywall. 12/14/2023 | |
12/14/2023 | COT - HCBU - Building Progress | Passed | All electrical and plumbing lines in walls well secured and under pressure. Okay for drywall. 12/14/2023 | |
02/09/2024 | COT - HCBU - Building Above Ceiling | Passed | Mechanical, electrical, plumbing, and fire suppression systems are completed above grid ceiling. Okay to install ceiling tiles in grid ceiling. | |
02/09/2024 | COT - HCBU - Framing | Passed | 2/9/24: Soffits and hard lid ceilings are completed. | |
02/09/2024 | COT - HCME - Mechanical Above Ceiling | Passed | Mechanical HVAC ductwork, supply boxes, return boxes, and diffusers are properly installed above ceiling and properly secured to grid ceiling. Okay to install ceiling tiles in grid ceiling. | |
02/09/2024 | COT - HCEL - Electrical Above Ceiling | Passed | Electrical lights, junction boxes, and conduit is properly installed and labeled. Okay to install ceiling tiles throughout space. | |
02/09/2024 | COT - HCEL - Electrical Progress | Passed | 2/9/24: Electrical boxes, wiring, and conduit is properly installed in ceiling and walls. | |
02/14/2024 | TRSP - ROW - Final/Close-Out | Passed | ||
02/14/2024 | ENGR Engineering Final | Passed | ||
02/14/2024 | COT - HCEL - Electrical Final | Passed | ||
02/14/2024 | COT - HCME - Mechanical Final | Passed | ||
03/20/2024 | COT - FCON - Fire - Final | Passed | ||
03/20/2024 | COT - HCBU - Building Final | Passed | 3/20/24: Carpentry, mechanical, plumbing, and electrical work is complete and fully operational. Restrooms are in ADA compliance with pipe protection and grab bars. Contractor has hard copies of the Chlorination Report and Air Balance Report, will have his office upload to the portal this morning. Okay to issue a full Certificate of Occupancy after Fire and Engineering inspections have passed. | |
03/20/2024 | COT - HCBU - CofO | Passed | 3/20/24: Carpentry, mechanical, plumbing, and electrical work is complete and fully operational. Restrooms are in ADA compliance with pipe protection and grab bars. Contractor has hard copies of the Chlorination Report and Air Balance Report, will have his office upload to the portal this morning. Okay to issue a full Certificate of Occupancy after Fire and Engineering inspections have passed. |